Xinzheng Lu
Title
Cited by
Cited by
Year
Bond–slip models for FRP sheets/plates bonded to concrete
XZ Lu, JG Teng, LP Ye, JJ Jiang
Engineering Structures 27 (6), 920-937, 2005
9342005
混凝土结构有限元分析
江见鲸, 陆新征, 叶列平
清华大学出版社, 2005
651*2005
利用 ANSYS Solid65 单元分析复杂应力条件下的混凝土结构 [J]
陆新征, 江见鲸
建筑结构 33 (6), 22-24, 2003
285*2003
Meso-scale finite element model for FRP sheets/plates bonded to concrete
XZ Lu, LP Ye, JG Teng, JJ Jiang
Engineering structures 27 (4), 564-575, 2005
2282005
汶川地震建筑震害分析
清华大学土木工程结构专家组, 西南交通大学土木工程结构专家组, ...
建筑结构学报 29 (04), 1-9, 2008
205*2008
Intermediate crack debonding in FRP-strengthened RC beams: FE analysis and strength model
XZ Lu, JG Teng, LP Ye, JJ Jiang
Journal of Composites for Construction 11 (2), 161-174, 2007
1922007
混凝土结构抗震非线性分析模型, 方法及算例
叶列平, 陆新征, 马千里, 汪训流, 缪志伟
工程力学 23 (2), 131-140, 2006
179*2006
从汶川地震中框架结构震害谈 “强柱弱梁” 屈服机制的实现 [J]
叶列平, 曲哲, 马千里, 林旭川, 陆新征, 潘鹏
建筑结构 38 (11), 52-59, 2008
173*2008
An improved tie force method for progressive collapse resistance design of reinforced concrete frame structures
Y Li, X Lu, H Guan, L Ye
Engineering Structures 33 (10), 2931-2942, 2011
1562011
建筑抗震弹塑性分析——原理, 模型与在 ABAQUS, MSC. MARC 和 SAP2000 上的实践
陆新征, 叶列平, 缪志伟
北京: 中国建筑工业出版社, 2009
154*2009
Collapse simulation of reinforced concrete high‐rise building induced by extreme earthquakes
X Lu, X Lu, H Guan, L Ye
Earthquake Engineering & Structural Dynamics 42 (5), 705-723, 2013
1452013
往复荷载下钢筋混凝土柱受力性能的数值模拟
汪训流, 陆新征, 叶列平
工程力学 24 (12), 76-81, 2007
139*2007
A shear wall element for nonlinear seismic analysis of super-tall buildings using OpenSees
X Lu, L Xie, H Guan, Y Huang, X Lu
Finite Elements in Analysis and Design 98, 14-25, 2015
1332015
世界贸易中心飞机撞击后倒塌过程的仿真分析
陆新征, 江见鲸
土木工程学报 34 (6), 8-10, 2001
1222001
提高建筑结构抗地震倒塌能力的设计思想与方法
叶列平, 曲哲, 陆新征, 冯鹏
建筑结构学报 29 (04), 42-50, 2008
115*2008
不同抗震设防 RC 框架结构抗倒塌能力研究
施炜, 叶列平, 陆新征, 唐代远
工程力学 28 (3), 41-48, 2011
103*2011
某特深基坑支护的非线性三维有限元分析
宋二祥, 娄鹏, 陆新征, 沈伟
岩土力学 25 (4), 538-543, 2004
103*2004
Experimental investigation of progressive collapse resistance of one-way reinforced concrete beam–slab substructures under a middle-column-removal scenario
P Ren, Y Li, X Lu, H Guan, Y Zhou
Engineering Structures 118, 28-40, 2016
1012016
Finite element simulation of debonding in FRP-to-concrete bonded joints
XZ Lu, JJ Jiang, JG Teng, LP Ye
Construction and Building Materials 20 (6), 412-424, 2006
992006
框架结构抗地震倒塌能力的研究
叶列平, 陆新征, 赵世春, 李易
建筑结构学报 30 (6), 67-76, 2009
95*2009
The system can't perform the operation now. Try again later.
Articles 1–20