Guomin (Kevin) Zhang
Guomin (Kevin) Zhang
Professor of Construction Engineering and Management, Associate Dean, School of Engineering, RMIT
Verified email at rmit.edu.au
Title
Cited by
Cited by
Year
Understanding the key risks in construction projects in China
PXW Zou, G Zhang, J Wang
International Journal of Project Management 25 (6), 601-614, 2007
8942007
Modelling optimal risk allocation in PPP projects using artificial neural networks
XH Jin, G Zhang
International journal of project management 29 (5), 591-603, 2011
2712011
Identifying key risks in construction projects: life cycle and stakeholder perspectives
PXW Zou, G Zhang, JY Wang
Pacific Rim Real Estate Society Conference, 2006
1952006
Fuzzy analytical hierarchy process risk assessment approach for joint venture construction projects in China
G Zhang, PX Zou
Journal of Construction Engineering and Management 133 (10), 771-779, 2007
1742007
Comparative study on the perception of construction safety risks in China and Australia
PX Zou, G Zhang
Journal of construction engineering and management 135 (7), 620-627, 2009
962009
Environmental emissions at foundation construction stage of buildings–Two case studies
M Sandanayake, G Zhang, S Setunge
Building and Environment 95, 189-198, 2016
922016
Overview of alliancing research and practice in the construction industry
G Chen, G Zhang, YM Xie, XH Jin
Architectural Engineering and Design Management 8 (2), 103-119, 2012
812012
Demolition waste generation and recycling potentials in a rapidly developing flagship megacity of South China: Prospective scenarios and implications
H Wu, H Duan, L Zheng, J Wang, Y Niu, G Zhang
Construction and Building Materials 113, 1007-1016, 2016
762016
Life cycle assessment of shipping container home: a sustainable construction
H Islam, G Zhang, S Setunge, MA Bhuiyan
Energy and Buildings 128, 673-685, 2016
702016
Managing risks in construction projects: life cycle and stakeholder perspectives
PXW Zou, G Zhang
International Journal of Construction Management 9 (1), 61-77, 2009
632009
Determining the influencing factors on the performance of solar chimney in buildings
L Shi, G Zhang, W Yang, D Huang, X Cheng, S Setunge
Renewable and Sustainable Energy Reviews 88, 223-238, 2018
542018
Models and method for estimation and comparison of direct emissions in building construction in Australia and a case study
M Sandanayake, G Zhang, S Setunge, CQ Li, J Fang
Energy and Buildings 126, 128-138, 2016
532016
Employees' turnover, knowledge management and human recourse management: a case of Nitaqat program
N Alshanbri, M Khalfan, MA Noor, D Dutta, K Zhang, T Maqsood
International Journal of Social Science and Humanity 5 (8), 701, 2015
512015
Greenhouse gas emissions during timber and concrete building construction—A scenario based comparative case study
M Sandanayake, W Lokuge, G Zhang, S Setunge, Q Thushar
Sustainable Cities and Society 38, 91-97, 2018
502018
Factors influencing the service lifespan of buildings: An improved hedonic model
G Liu, K Xu, X Zhang, G Zhang
Habitat International 43, 274-282, 2014
412014
A risk assessment method to quantitatively investigate the methane explosion in underground coal mine
L Shi, J Wang, G Zhang, X Cheng, X Zhao
Process Safety and Environmental Protection 107, 317-333, 2017
392017
Fire safety of composites in prefabricated buildings: From fibre reinforced polymer to textile reinforced concrete
KTQ Nguyen, S Navaratnam, P Mendis, K Zhang, J Barnett, H Wang
Composites Part B: Engineering 187, 107815, 2020
362020
Greenhouse gas emissions of different fly ash based geopolymer concretes in building construction
M Sandanayake, C Gunasekara, D Law, G Zhang, S Setunge
Journal of Cleaner Production 204, 399-408, 2018
352018
A comparative method of air emission impact assessment for building construction activities
M Sandanayake, G Zhang, S Setunge
Environmental Impact Assessment Review 68, 1-9, 2018
332018
An empirical model to predict the performance of typical solar chimneys considering both room and cavity configurations
L Shi, G Zhang
Building and environment 103, 250-261, 2016
332016
The system can't perform the operation now. Try again later.
Articles 1–20