Mehrdad Arashpour
TitleCited byYear
Collaboration in BIM-based construction networks: A bibliometric-qualitative literature review
M Oraee, MR Hosseini, E Papadonikolaki, R Palliyaguru, M Arashpour
International Journal of Project Management 35 (7), 1288-1301, 2017
482017
Optimization of process integration and multi-skilled resource utilization in off-site construction
M Arashpour, R Wakefield, N Blismas, J Minas
Automation in Construction 50, 72-80, 2015
482015
Off-site construction optimization: Sequencing multiple job classes with time constraints
M Arashpour, R Wakefield, B Abbasi, EWM Lee, J Minas
Automation in construction 71, 262-270, 2016
442016
Analysis of workflow variability and its impacts on productivity and performance in construction of multistory buildings
M Arashpour, M Arashpour
Journal of Management in Engineering 31 (6), 04015006, 2015
422015
Analysis of interacting uncertainties in on-site and off-site activities: Implications for hybrid construction
M Arashpour, R Wakefield, EWM Lee, R Chan, MR Hosseini
International Journal of Project Management 34 (7), 1393-1402, 2016
412016
Analysis of disruptions caused by construction field rework on productivity in residential projects
M Arashpour, R Wakefield, N Blismas, EWM Lee
Journal of Construction Engineering and Management 140 (2), 04013053, 2013
402013
Critical evaluation of off-site construction research: A Scientometric analysis
MR Hosseini, I Martek, EK Zavadskas, AA Aibinu, M Arashpour, ...
Automation in Construction 87, 235-247, 2018
372018
Enhancing collaboration in BIM-based construction networks through organisational discontinuity theory: a case study of the new Royal Adelaide Hospital
G Mignone, MR Hosseini, N Chileshe, M Arashpour
Architectural Engineering and Design Management 12 (5), 333-352, 2016
302016
Integrated management of on-site, coordination and off-site uncertainty: theorizing risk analysis within a hybrid project setting
M Arashpour, B Abbasi, M Arashpour, MR Hosseini, R Yang
International journal of project management 35 (4), 647-655, 2017
282017
Autonomous production tracking for augmenting output in off-site construction
M Arashpour, R Wakefield, N Blismas, T Maqsood
Automation in construction 53, 13-21, 2015
282015
Optimal process integration architectures in off-site construction: Theorizing the use of multi-skilled resources
M Arashpour, R Wakefield, B Abbasi, M Arashpour, R Hosseini
Architectural engineering and design management 14 (1-2), 46-59, 2018
242018
Valuing the contribution of knowledge-oriented workers to projects: a merit based approach in the construction industry
M Arashpour, M Shabanikia, M Arashpour
Australasian Journal of Construction Economics and Building 12 (4), 1-12, 2012
212012
Optimizing decisions in advanced manufacturing of prefabricated products: Theorizing supply chain configurations in off-site construction
M Arashpour, Y Bai, G Aranda-mena, A Bab-Hadiashar, R Hosseini, ...
Automation in Construction 84, 146-153, 2017
192017
Gaining the best value from HR in construction companies
M Arashpour, M Arashpour
Proceedings of the 6th European Conference on Management Leadership and …, 2010
182010
Quantitative analysis of rate-driven and due date–driven construction: Production efficiency, supervision, and controllability in residential projects
M Arashpour, R Wakefield, N Blismas, B Abbasi
Journal of construction engineering and management 142 (1), 05015012, 2015
172015
Critical success factors for implementing risk management systems in developing countries
M Reza Hosseini, N Chileshe, J Jepson, M Arashpour
Construction Economics and Building 16 (1), 18-32, 2016
162016
Application of Nonlinear-Autoregressive-Exogenous model to predict the hysteretic behaviour of passive control systems
RWK Chan, JKK Yuen, EWM Lee, M Arashpour
Engineering Structures 85, 1-10, 2015
162015
A new approach for modelling variability in residential construction projects
M Arashpour, R Wakefield, N Blismas
Construction Economics and Building 13 (2), 83-92, 2013
162013
Framework for improving workflow stability: deployment of optimized capacity buffers in a synchronized construction production
M Arashpour, R Wakefield, N Blismas, EWM Lee
Canadian Journal of Civil Engineering 41 (12), 995-1004, 2014
152014
A fully autonomous kernel-based online learning neural network model and its application to building cooling load prediction
EWM Lee, IWH Fung, VWY Tam, M Arashpour
Soft computing 18 (10), 1999-2014, 2014
122014
The system can't perform the operation now. Try again later.
Articles 1–20