Joint optimization of dynamic pricing and replenishment cycle considering variable non-instantaneous deterioration and stock-dependent demand N Tashakkor, SH Mirmohammadi, M Iranpoor Computers & Industrial Engineering 123, 232-241, 2018 | 45 | 2018 |
Cardinality constrained portfolio optimization using a hybrid approach based on particle swarm optimization and hopfield neural network AN Sadigh, H Mokhtari, M Iranpoor, SMT Ghomi Advanced Science Letters 17 (1), 11-20, 2012 | 45 | 2012 |
A game-theoretic approach for decision analysis in end-of-life vehicle reverse supply chain regarding government subsidy MA Gorji, MB Jamali, M Iranpoor Waste Management 120, 734-747, 2021 | 39 | 2021 |
Due-date assignment and machine scheduling in a low machine-rate situation with stochastic processing times M Iranpoor, SMTF Ghomi, M Zandieh Computers & Operations Research 40 (4), 1100-1108, 2013 | 18 | 2013 |
Pricing policy on a dual competitive channel for a green product under fuzzy conditions MB Jamali, MA Gorji, M Iranpoor Neural Computing and Applications, 1-13, 2021 | 17 | 2021 |
Machine scheduling in the presence of sequence-dependent setup times and a rate-modifying activity M Iranpoor, SMTF Ghomi, M Zandieh International Journal of Production Research 50 (24), 7401-7414, 2012 | 16 | 2012 |
Earliness tardiness production planning and scheduling in flexible flowshop systems under finite planning horizon M Iranpoor, SMTF Ghomi, A Mohamadinia Applied mathematics and computation 184 (2), 950-964, 2007 | 16 | 2007 |
Periodic flexible maintenance planning in a single-machine production environment M Iranpoor, SMT Fatemi Ghomi Journal of Industrial Engineering International 15, 627-635, 2019 | 8 | 2019 |
Minimal covering unrestricted location of obnoxious facilities: bi-objective formulation and a case study K Alamatsaz, SMT Fatemi Ghomi, M Iranpoor Opsearch 58 (2), 351-373, 2021 | 7 | 2021 |
Order acceptance and due-date quotation in low machine rates M Iranpoor, SMTF Ghomi, M Zandieh Applied Mathematical Modelling 38 (7-8), 2063-2072, 2014 | 7 | 2014 |
Earliness-tardiness-lost sales dynamic job-shop scheduling SMT Fatemi Ghomi, M Iranpoor Production Engineering 4, 221-230, 2010 | 7 | 2010 |
Knights Exchange Puzzle—Teaching the Efficiency of Modeling M Iranpoor INFORMS Transactions on Education 21 (2), 108-114, 2021 | 3 | 2021 |
Edge covering with continuous location along the network K Alamatsaz, A Jolfaei, M Iranpoor International Journal of Industrial Engineering Computations 11 (4), 627-642, 2020 | 3 | 2020 |
The integrated planning of outgoing coil selection for retrieval, multi-crane scheduling, and location assignment to the incoming and blocking coils in steel coil warehouses F Nadali, M Iranpoor, Y Malekian Computers & Industrial Engineering 190, 110058, 2024 | 1 | 2024 |
Integrated due date setting and scheduling on a single machine considering an unexpected unavailability M Iranpoor, SMT Fatemi Ghomi Journal of Optimization in Industrial Engineering 12 (1), 1-13, 2019 | 1 | 2019 |
THE CRITICAL SUCCESS FACTORS FOR IMPLEMENTING ELECTRONIC LOGISTICS IN THE ISFAHAN HEALTH CITY S Darabi, M Iranpoor, A Amindoust JOURNAL OF HEALTHCARE MANAGEMENT (JOURNAL OF HEALTH SYSTEM) 7 (321), 55-70, 2016 | 1 | 2016 |
Integrated Scheduling of Sports Events: A Macroscopic Perspective M Iranpoor, A Aghadavoudi Jolfaei, M Batavani International Journal of Supply and Operations Management 10 (2), 174-186, 2023 | | 2023 |
The application of the response surface methodology for water repellency finishing of polyester and cotton fabric N Ahmadyar, A Kazemian, M Iranpoor Journal of Textile Science and Technology 7 (1), 11-22, 2018 | | 2018 |
کاربرد روش سطح پاسخ در بهینه سازی ضد آب کردن پارچه های پلی استری و پنبه ای احمدیار, نساء, کاظمیان, احمد, ایرانپور علوم و فناوری نساجی و پوشاک 7 (1), 11-22, 2018 | | 2018 |
Identify and Prioritize the Critical Success Factors for Implementing Electronic Logistics in the Isfahan Health City S Darabi, M Iranpoor, AH Amindoust Journal of healthcare management 7 (no3), 57-72, 2016 | | 2016 |