Follow
Ali Nazem
Ali Nazem
Colorado School of Mines
Verified email at hntb.com
Title
Cited by
Cited by
Year
Surface settlement prediction for EPB shield tunneling in sandy ground
Y Fang, C He, A Nazem, Z Yao, J Grasmick
KSCE Journal of Civil Engineering 21, 2908-2918, 2017
492017
Experimental study on the stability of foam-conditioned sand under pressure in the EPBM chamber
Y Wu, A Nazem, F Meng, MA Mooney
Tunnelling and Underground Space Technology 106, 103590, 2020
262020
On the selection of an appropriate excavation pattern for urban tunnels with big cross-section: A case study
R Bolghonabai, MF Hossaini, M Mohammadi, A Nazem
International Journal of Mining and Geo-Engineering 49 (2), 297-307, 2015
92015
Optimization of conformal mapping functions used in developing closed-form solutions for underground structures with conventional cross sections
A Nazem, M Farouq Hossaini, H Rahami, R Bolghonabadi
International Journal of Mining and Geo-Engineering 49 (1), 93-102, 2015
82015
An investigation of surface roughness measurement in rock joints with a 3D scanning device
M Moosavi, HN Rafsanjani, MH Mehranpour, A Nazem, AN Shirazi
ISRM SINOROCK, ISRM-SINOROCK-2013-017, 2013
82013
Identification of rheological behavior of salt rock at elevated temperature, case study: Gachsaran evaporative formation, Iran
NA Ghavidel, A Nazem, M Heidarizadeh, M Moosavi, H Memarian
ISRM EUROCK, ISRM-EUROCK-2014-044, 2014
52014
The EPB Chamber Air Bubble: What Causes It?
Y Wu, A Nazem, M Mooney
North American Tunneling 2018 Proceedings, 2018
2018
The system can't perform the operation now. Try again later.
Articles 1–7