Developing strategies for managing construction and demolition wastes in Malaysia based on the concept of circular economy MR Esa, A Halog, L Rigamonti Journal of Material Cycles and Waste Management 19, 1144-1154, 2017 | 324 | 2017 |
Strategies for minimizing construction and demolition wastes in Malaysia MR Esa, A Halog, L Rigamonti Resources, Conservation and Recycling 120, 219-229, 2017 | 220 | 2017 |
Obstacles in implementing green building projects in Malaysia MR Bin Esa, MA Marhani, R Yaman, A Noor, HA Rashid Australian Journal of Basic and Applied Sciences 5 (12), 1806-1812, 2011 | 122 | 2011 |
Dependency of foreign workers in Malaysian construction industry MA Marhani, H Adnan, HE Baharuddin, MR Esa, AA Hassan Built Environment Journal (BEJ) 9 (1), 39-50, 2012 | 56 | 2012 |
Delivering best value for design and build (D&B) projects through integrated process improvements solution R Takim, MR Esa, SHA Hamid Procedia-Social and Behavioral Sciences 101, 62-70, 2013 | 18 | 2013 |
Moving towards sustainable construction in Malaysia: a holistic model for construction and demolition (C&D) waste management MR Esa | 15 | 2018 |
Redesigning a design as a case of mass housing in Malaysia R Yaman, H Adnan, MR Esa, NM Ishak ARPN Journal of Engineering and Applied Sciences 7 (12), 1652-1657, 2012 | 10 | 2012 |
Critical components contributing to disaster resilience hospitals NM Samsuddin, R Takim, AH Nawawi, MR Esa Australian Journal of Basic and Applied Sciences 9 (7), 72-75, 2015 | 7 | 2015 |
Assessment on the circular economy for waste minimization in the construction industry/Dr Mohd Reza Esa, Wan Azlan Shah Eddie Shah Edward and Anthony Halog MR Esa, WAS Eddie Shah Edward, A Halog Built Environment Journal 18 (2), 11-22, 2021 | 4 | 2021 |
Waste management in construction industry-a review on the issues and challenges MR Esa, A Halog, F Zuhaira Ismail 4th International Conference on Environmental Research and Technology (ICERT …, 2015 | 4* | 2015 |
Preservation of historical schools and heritage tourism in Malaysia J Abdullah, S Ahmad Zaki, S Abdul Latib | 4* | 2008 |
A Circularity-based Planning Approach for Construction and Demolition (C&D) Waste Management: A Case Study of Malaysia MR Esa, A Halog, J Zulkepli, L Rigamonti, SM Shaari MATEC Web of Conferences 266, 01003, 2019 | 3 | 2019 |
Construction and demolition waste management: a conceptual framework MR Esa, A Halog, L Rigamonti International Journal of Environment and Waste Management 35 (3), 278-306, 2024 | | 2024 |
IR 4.0: Preliminary framework of industrialised building system (IBS) implementation for SMEs MR Esa, AA Aziz, MDA Hafiz AIP Conference Proceedings 2881 (1), 2023 | | 2023 |
Preface: 3rd International Conference on the Built Environment and Engineering (IConBEE) 2022 MR Esa, MAM Fateh, FZ Ismail, J Brahim, AM Saleh, SRHA Wahab, ... AIP Conference Proceedings 2881 (1), 010001, 2023 | | 2023 |
The Roles of Contractors in Implementing Quality Assessment System in Construction (QLASSIC) in Construction Projects MS Seman, MR Esa, MR Yusof International Journal of Real Estate Studies 15 (S1), 53-69, 2021 | | 2021 |
Strategic construction waste management model for Contractors of large residential projects SM Awang Rosppa, J Yunus, MR Esa, SA Ramli | | 2021 |
A glance at the world MR Esa, A Halog Waste Management 64, I-II, 2017 | | 2017 |
Influencing Factors of Construction and Demolition (C&D) Wastes Generation in Malaysia MR Esa, A Halog, L Rigamonti 1st International Conference on Liveable Built Environment (ICLBE), 80, 2016 | | 2016 |
Greening a society for a resilient development F Zuhaira Ismail, A Halog, MR Esa School of Industrial Technology, Universiti Sains Malaysia, 2015 | | 2015 |