Saeed Banihashemi
Title
Cited by
Cited by
Year
Critical success factors (CSFs) for integration of sustainability into construction project management practices in developing countries
S Banihashemi, MR Hosseini, H Golizadeh, S Sankaran
International Journal of Project Management 35 (6), 1103-1119, 2017
1482017
BIM adoption within Australian Small and Medium-sized Enterprises (SMEs): An Innovation Diffusion Model
MR Hosseini, S Banihashemi, N Chileshe, M Namzadi, C Udaeja, ...
Construction Economics and Building 16 (3), 71-86, 2016
862016
Personnel selection based on a novel model of game theory and MCDM approaches
SH Zolfani, SSA Banihashemi
Proc. of 8th International Scientific Conference" Business and Management, 15-16, 2014
542014
Assessment of the variation impacts of window on energy consumption and carbon footprint
MM Tahmasebi, S Banihashemi, MS Hassanabadi
Procedia engineering 21, 820-828, 2011
392011
Integration of parametric design into modular coordination: A construction waste reduction workflow
S Banihashemi, A Tabadkani, MR Hosseini
Automation in Construction 88, 1-12, 2018
282018
Sustainable delivery of megaprojects in Iran: Integrated model of contextual factors
MR Hosseini, S Banihashemi, I Martek, H Golizadeh, F Ghodoosi
Journal of Management in Engineering 34 (2), 05017011, 2018
252018
Developing a hybrid model of prediction and classification algorithms for building energy consumption
S Banihashemi, G Ding, J Wang
Energy Procedia 110, 371-376, 2017
252017
Flexibility of BIM towards Design Change
E Shourangiz, MI Mohamad, MS Hassanabadi, S Banihashemi
2nd International Conference on Construction and Project Management, IPEDR …, 2011
242011
Managerial sustainability assessment tool for Iran's buildings
S Banihashemi, M Shakouri, MM Tahmasebi, C Preece
Proceedings of the ICE - Engineering Sustainability 167 (1), 12-23, 2014
23*2014
Daylighting and visual comfort of oriental sun responsive skins: A parametric analysis
A Tabadkani, S Banihashemi, MR Hosseini
Building Simulation, 1-14, 2018
202018
Climatic, parametric and non-parametric analysis of energy performance of double-glazed windows in different climates
S Banihashemi, H Golizadeh, MR Hosseini, M Shakouri
International Journal of Sustainable Built Environment 4 (2), 307-322, 2015
202015
BARRIERS TO BIM ADOPTION: PERCEPTIONS FROM AUSTRALIAN SMALL AND MEDIUM-SIZED ENTERPRISES (SMES)
MR Hosseini, M Namzadi, R Rameezdeen, S Banihashemi, N Chileshe
40th AUBEA 2016 (Radical Innovation in the Built Environment), 2016
192016
Integrated parametric design of adaptive facades for user's visual comfort
A Tabadkani, M Valinejad Shoubi, F Soflaei, S Banihashemi
Automation in Construction 106, 2019
162019
BIM applications toward key performance indicators of construction projects in Iran
M Khanzadi, M Sheikhkhoshkar, S Banihashemi
International Journal of Construction Management, 1-17, 2018
152018
Developing an empirical predictive energy-rating model for windows by using Artificial Neural Network
M Shakouri Hassanabadi, S Banihashemi
International Journal of Green Energy, 2012
15*2012
Sustainability by Information and Communication Technology: A Paradigm Shift for Construction Projects in Iran
MR Hosseini, S Banihashemi, R Rameezdeen, H Golizadeh, ...
Journal of Cleaner Production 168, 1-13, 2017
142017
Building Information Modeling (BIM) in Iran: An Exploratory Study
MR Hosseini, E Azari, L Tivendale, S Banihashemi, N Chileshe
Journal of Engineering, Project, and Production Management, 2016
132016
Viability of the BIM Manager Enduring as a Distinct Role: Association Rule Mining of Job Advertisements
MR Hosseini, I Martek, E Papadonikolaki, M Sheikhkhoshkar, ...
Construction Engineering and Management 144 (9), 1-11, 2018
112018
Where the Gaps Lie: Ten Years of Research into Collaboration on BIM-Enabled Construction Projects
M Oraee, MR Hosseini, S Banihashemi, C Merschbrock
Construction Economics and Building 17 (1), 121-139, 2017
112017
Modular Coordination-based Generative Algorithm to Optimize Construction Waste
S Banihashemi, A Tabadkani, MR Hosseini
Procedia Engineering 180, 631-639, 2017
102017
The system can't perform the operation now. Try again later.
Articles 1–20