Jacques Erschler
Jacques Erschler
Université de Toulouse, INSA, LAAS
Verified email at univ-toulouse.fr
Title
Cited by
Cited by
Year
Finding some essential characteristics of the feasible solutions for a scheduling problem
J Erschler, F Roubellat, JP Vernhes
Operations Research 24 (4), 774-783, 1976
1131976
Raisonnement temporel sous contraintes de ressource et problèmes d'ordonnancement
J Erschler, P Lopez, C Thuriot
Revue d'intelligence artificielle 5 (3), 7-32, 1991
841991
A New Dominance Concept in Scheduling n Jobs on a Single Machine with Ready Times and Due Dates
J Erschler, G Fontan, C Mercé, F Roubellat
Operations Research 31 (1), 114-127, 1983
841983
Ordonnancement de tâches sous contraintes: une approche énergétique
P Lopez, J Erschler, P Esquirol
Automatique-productique informatique industrielle 26 (5-6), 453-481, 1992
801992
Consistency of the disaggregation process in hierarchical planning
J Erschler, G Fontan, C Mercé
Operations Research 34 (3), 464-469, 1986
741986
Decision-aid in job shop scheduling: A knowledge based approach
J Erschler, P Esquirol
Proceedings. 1986 IEEE International Conference on Robotics and Automation 3 …, 1986
701986
Analyse sous contraintes et aide à la décision pour certains problèmes d'ordonnancement
J Erschler
Université de Toulouse, 1976
681976
Periodic loading of flexible manufacturing systems
J ERSCHELER
Proc. of the IFIP Congress, APMS, Bordeaux, France, 327-339, 1982
671982
Les problèmes d'ordonnancement
J Carlier, P Chrétienne, J Erschler, C Hanen, P Lopez, A Munier, E Pinson, ...
RAIRO-Operations Research 27 (1), 77-150, 1993
611993
Characterizing the set of feasible sequences for n jobs to be carried out on a single machine
J Erschler, F Roubellat, JP Vernhes
European Journal of Operational Research 4 (3), 189-194, 1980
501980
Automation of a hydroelectric power station using variable-structure control systems
J Erschler, F Roubellat, JP Vernhes
Automatica 10 (1), 31-36, 1974
441974
A knowledge-based approach to industrial job-shop scheduling
G Bel, E Bensana, D Dubois, J Erschler, P Esquirol
Knowledge-Based Systems in Manufacturing, Andrew Kusiak (ed.), Taylor …, 1989
411989
A robust approach for the single machine scheduling problem
C Briand, HT La, J Erschler
Journal of Scheduling 10 (3), 209-221, 2007
372007
Energy-based approach for task scheduling under time and resources constraints
J Erschler, P Lopez
2nd international workshop on project management and scheduling, 115-121, 1990
371990
AN APPROACH FOR REAL TIME SCHEDULING OF ACTIVITIES WITH TIME AND RESOURCE CONSTRAINTS
J Erschler, F Roubellat
Advances in project scheduling, 237-272, 1989
281989
Steady state scheduling of a flexible manufacturing system with periodic releasing and flow time constraints
J Erschler, F Roubellat, C Thuriot
Annals of Operations Research 3 (7), 333-353, 1985
281985
A new sufficient condition of optimality for the two-machine flowshop problem
C Briand, HT La, J Erschler
European Journal of Operational Research 169 (3), 712-722, 2006
212006
Approche par contraintes pour l’aide aux décisions d’ordonnancement
J Erschler, C Thuriot, G de Terssac, P Dubois
Les nouvelles rationalisations de la production, 249-266, 1992
211992
Coopération et organisation de l’action collective
JC Sardas, J Erschler, G De Terssac
Coopération et connaissance dans les systèmes industriels sous la direction …, 2002
192002
A decision-making process for the real time control of a production unit
J Erschler, F Roubellat, JP Vernhes
THE INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH 14 (2), 275-284, 1976
191976
The system can't perform the operation now. Try again later.
Articles 1–20