关注
Chengke Wu
标题
引用次数
引用次数
年份
A SWOT analysis for promoting off-site construction under the backdrop of China’s new urbanisation
R Jiang, C Mao, L Hou, C Wu, J Tan
Journal of Cleaner Production 173, 225-234, 2018
1212018
Critical review of data-driven decision-making in bridge operation and maintenance
C Wu, P Wu, J Wang, R Jiang, M Chen, X Wang
Structure and Infrastructure Engineering 18 (1), 47-70, 2021
812021
Overview of BIM maturity measurement tools
C Wu, B Xu, C Mao, X Li
Journal of Information Technology in Construction (ITcon) 22 (3), 34-62, 2017
672017
Ontological knowledge base for concrete bridge rehabilitation project management
C Wu, P Wu, J Wang, R Jiang, M Chen, X Wang
Automation in construction 121, 103428, 2021
522021
Ecosystem visualization and analysis of Chinese prefabricated housing industry
R Jiang, C Wu, C Mao, A Shrestha
Procedia Engineering 145, 436-443, 2016
212016
SWP-enabled constraints modeling for on-site assembly process of prefabrication housing production
X Li, C Wu, P Wu, L Xiang, GQ Shen, S Vick, CZ Li
Journal of Cleaner Production 239, 117991, 2019
192019
Hybrid deep learning model for automating constraint modelling in advanced working packaging
C Wu, X Wang, P Wu, J Wang, R Jiang, M Chen, M Swapan
Automation in Construction 127, 103733, 2021
132021
Natural language processing for smart construction: Current status and future directions
C Wu, X Li, Y Guo, J Wang, Z Ren, M Wang, Z Yang
Automation in Construction 134, 104059, 2022
112022
Understanding laborers’ behavioral diversities in multinational construction projects using integrated simulation approach
C Wu, C Chen, R Jiang, P Wu, B Xu, J Wang
Engineering, Construction and Architectural Management 26 (9), 2120-2146, 2019
112019
Developing a hybrid approach to extract constraints related information for constraint management
C Wu, P Wu, J Wang, R Jiang, M Chen, X Wang
Automation in Construction 124, 103563, 2021
72021
Estimating carbon emissions from road use, maintenance and rehabilitation through a hybrid life cycle assessment approach–A case study
R Jiang, C Wu, Y Song, P Wu
Journal of Cleaner Production 277, 123276, 2020
72020
Government efforts and roadmaps for building information modeling implementation: lessons from Singapore, the UK and the US
R Jiang, C Wu, X Lei, A Shemery, KD Hampson, P Wu
Engineering, Construction and Architectural Management, 2021
52021
Ontology-based mapping approach for automatic work packaging in modular construction
X Li, C Wu, F Xue, Z Yang, J Lou, W Lu
Automation in Construction 134, 104083, 2022
42022
基于 BIM 的工程管理专业毕业设计改革——以重庆大学为例
李世蓉, 吴承科, 李骁
工程经济, 57-61, 2016
32016
Integration of BIM and computer simulations in modular construction, A case study
C Wu, R Jiang, X Li
Modular and Offsite Construction (MOC) Summit Proceedings, 2016
22016
Driving Factors behind Energy-Related Carbon Emissions in the US Road Transport Sector: A Decomposition Analysis
R Jiang, P Wu, C Wu
International Journal of Environmental Research and Public Health 19 (4), 2321, 2022
12022
Selecting the optimal network-level pavement maintenance budget scenario based on sustainable considerations
R Jiang, P Wu, C Wu
Transportation Research Part D: Transport and Environment 97, 102919, 2021
12021
Evaluating the economic and social benefits of multiutility tunnels with an agent-based simulation approach
C Wu, P Wu, R Jiang, J Wang, X Wang, M Wan
Engineering, Construction and Architectural Management, 2020
12020
An Evaluation of Project Management System of Public Construction Sector in Shenzhen, China
C Wu, X Li, S Li, B Xu
Proceedings of the 20th International Symposium on Advancement of …, 2017
12017
A multi-step predictive deep reinforcement learning algorithm for HVAC control systems in smart buildings
X Liu, M Ren, Z Yang, G Yan, Y Guo, L Cheng, C Wu
Energy, 124857, 2022
2022
系统目前无法执行此操作,请稍后再试。
文章 1–20