Arndt Goldack
Arndt Goldack
Statik und Dynamik der Tragwerke, Bergische Universität Wuppertal
Verified email at uni-wuppertal.de
Title
Cited by
Cited by
Year
Design of Leightweight footbridges for human induced vibrations
C Heinemeyer, C Butz, A Keil, M Schlaich, A Goldack, S Trometer, ...
652009
Advanced load models for synchronous pedestrian excitation and optimised design guidelines for steel footbridges (SYNPEX)
C Butz, CH Heinemeyer, A Goldack, A Keil, M Lukic, E Caetano, A Cunha
RFCS-Research Project RFS-CR-03019, 2007
522007
Design of floor structures for human induced vibrations
M Feldmann, C Heinemeyer, C Butz, E Caetano, A Cunha, F Galanti, ...
JRC–ECCS joint report, 2009
412009
Advanced load models for synchronous pedestrian excitation and optimised design guidelines for steel footbridges
C Butz, M Feldmann, C Heinemeyer, G Sedlacek, B Chabrolin, A Lamaire, ...
European Commission, Research Fund for Coal and Steel, European Communities …, 2008
312008
Ambient modal identification using multi‐rank parallel factor decomposition
A Sadhu, A Goldack, S Narasimhan
Structural Control and Health Monitoring 22 (4), 595-614, 2015
202015
Decentralized modal identification of a pony truss pedestrian bridge using wireless sensors
A Sadhu, S Narasimhan, A Goldack
Journal of Bridge Engineering 19 (6), 04014013, 2014
192014
Design of Lightweight Footbridges for Human Induced Vibrations: Background document in support to the implementation, harmonization and further development of the Eurocodes …
C Heinemeyer, PO Martin, S Trometor, A Keil, A Cunha, M Lukic, ...
Lehrstuhl für Stahl-und Leichtmetallbau und Institut für Stahlbau, 2009
192009
Human-induced vibration of steel structures (Hivoss)
M Feldmann, C Heinemeyer, M Lukic, E Caetano, Á Cunha, A Goldack, ...
Office for Official Publications of the European Communities, Luxembourg, 2010
132010
Experimental characterization of the dynamic behaviour of lively footbridges
C Butz, F Magalhaes, Á Cunha, E Caetano, A Goldack
Footbridge 2005 (Second International Congress), Venezia, 06-08 December 2005, 1, 2005
112005
Die Gänsebachtalbrücke, eine integrale Talbrücke der DB AG auf der Neubaustrecke Erfurt‐Leipzig/Halle
M Schenkel, A Goldack, J Schlaich, S Kraft
Beton‐und Stahlbetonbau 105 (9), 590-598, 2010
102010
Mode shape expansion for lively pedestrian bridges through kriging
P Simon, A Goldack, S Narasimhan
Journal of Bridge Engineering 21 (6), 04016015, 2016
82016
Design of Footbridges-Guidelines and background document
C Butz, C Heinemeyer, A Keil, M Schlaich, A Goldack, S Trometer, ...
HIVOSS, rFS2-CT-2007-00033, 2007
62007
Shape optimization of concrete shells with ruled surface geometry using line geometry
JP Osman-Letelier, A Goldack, M Schlaich, D Lordick, J Grave
Proceedings of IASS Annual Symposia 2017 (16), 1-10, 2017
52017
Stress ribbon bridges: mechanics of the stress ribbon on the saddle
A Goldack, M Schlaich, M Meiselbach
Journal of Bridge Engineering 21 (5), 04015089, 2016
52016
HIVOSS-Design of Footbridges; Guideline and Background Document
C Butz, C Heinemeyer, A Keil, M Schlaich, A Goldack, S Trometer, ...
European Commission, HIVOSS Project, 2008
52008
Die mehrfeldrige Spannbandbrücke Slinky Springs to Fame in Oberhausen
M Schlaich, A Goldack, M Nier
Stahlbau 81 (2), 108-115, 2012
42012
Accelerometer-based estimation and modal velocity feedback vibration control of a stress-ribbon bridge with pneumatic muscles
X Liu, T Schauer, A Goldack, A Bleicher, M Schlaich
Journal of Physics: Conference Series 744, 012041, 2016
32016
Simple model for contact stress of strands bent over Circular saddles
S Mohareb, A Goldack, M Schlaich
Challenges in Design and Construction of an Innovative and Sustainable Built …, 2016
32016
Design of floor structures for human induced vibrations: joint report, prepared under the JRC ECCS cooperation agreement for the evolution of Eurocode 3 (programme of CEN TC 250)
M Feldmann, A Keil, O Hechler, C Butz, P Waarts, M Lukic, A Smith, ...
Lehrstuhl für Stahl-und Leichtmetallbau und Institut für Stahlbau, 2009
32009
The Gansebach Valley Bridge, an Integral Valley Bridge owned by the DB AG on the New Railway Erfurt-Leipzig/Halle
M Schenkel, A Goldack, J Schlaich, S Kraft
Beton-und Stahlbetonbau 105 (9), 590-598, 2010
22010
The system can't perform the operation now. Try again later.
Articles 1–20