Deniz Türsel Eliiyi
Title
Cited by
Cited by
Year
The state of the art on buffer allocation problem: a comprehensive survey
L Demir, S Tunali, DT Eliiyi
Journal of Intelligent Manufacturing 25 (3), 371–392, 2014
1422014
An adaptive tabu search approach for buffer allocation problem in unreliable non-homogenous production lines
L Demir, S Tunalı, DT Eliiyi
Computers & Operations Research 39 (7), 1477-1486, 2012
572012
A vehicle scheduling problem with fixed trips and time limitations
DT Eliiyi, A Ornek, SS Karakütük
International Journal of Production Economics 117 (1), 150-161, 2009
342009
Trip allocation and stacking policies at a container terminal
C Güven, DT Eliiyi
Transportation Research Procedia 3, 565-573, 2014
312014
Metaheuristic algorithms for the hybrid flowshop scheduling problem
H Öztop, MF Tasgetiren, DT Eliiyi, QK Pan
Computers & Operations Research 111, 177-196, 2019
252019
Two approaches for solving the buffer allocation problem in unreliable production lines
L Demir, S Tunalı, DT Eliiyi, A Lĝkketangen
Computers & Operations Research 40 (10), 2556-2563, 2013
242013
Applications of Bin Packing Models Through The Supply Chain
U Eliiyi, DT Eliiyi
International Journal of Business and Management Studies 1 (1), 11-19, 2009
192009
A fixed job scheduling problem with machine-dependent job weights
DT Eliiyi, M Azizoğlu
International Journal of Production Research 47 (9), 2231-2256, 2009
162009
Spread time considerations in operational fixed job scheduling
DT Eliiyi, M Azizoglu
International Journal of Production Research 44 (20), 4343-4365, 2006
162006
Capacity improvement using simulation optimization approaches: A case study in the thermotechnology industry
SY Köse, L Demir, S Tunalı, DT Eliiyi
Engineering Optimization 47 (2), 149-164, 2015
152015
An energy-efficient permutation flowshop scheduling problem
H Öztop, MF Tasgetiren, DT Eliiyi, QK Pan, L Kandiller
Expert systems with applications 150, 113279, 2020
142020
Constraint and mathematical programming models for integrated port container terminal operations
D Kizilay, DT Eliiyi, P Van Hentenryck
International Conference on the Integration of Constraint Programming …, 2018
132018
Modelling and optimisation of online container stacking with operational constraints
C Güven, D Türsel Eliiyi
Maritime Policy & Management 46 (2), 201-216, 2019
122019
Energy-efficient single machine total weighted tardiness problem with sequence-dependent setup times
MF Tasgetiren, H Öztop, U Eliiyi, DT Eliiyi, QK Pan
International Conference on Intelligent Computing, 746-758, 2018
122018
Green permutation flowshop scheduling: a trade-off-between energy consumption and total flow time
H Öztop, MF Tasgetiren, DT Eliiyi, QK Pan
International Conference on Intelligent Computing, 753-759, 2018
122018
Heuristics for operational fixed job scheduling problems with working and spread time constraints
DT Eliiyi, M Azizoğlu
International Journal of Production Economics 132 (1), 107-121, 2011
122011
Island-based crow search algorithm for solving optimal control problems
MS Turgut, OE Turgut, DT Eliiyi
Applied Soft Computing 90, 106170, 2020
112020
A comprehensive review of quay crane scheduling, yard operations and integrations thereof in container terminals.
D Kizilay, DT Eliiyi
Flexible Services & Manufacturing Journal 33 (1), 2021
102021
Operational variable job scheduling with eligibility constraints: a randomized constraint-graph-based approach
DT Eliiyi, AG Korkmaz, AE Çiçek
Technological and Economic Development of Economy, 245, 2009
102009
A reward-based algorithm for the stacking of outbound containers
S Ozcan, DT Eliiyi
Transportation research procedia 22, 213-221, 2017
92017
The system can't perform the operation now. Try again later.
Articles 1–20