Follow
Ayhan Özgür Toy
Ayhan Özgür Toy
Professor of Industrial Engineering, Yaşar University
Verified email at yasar.edu.tr
Title
Cited by
Cited by
Year
Application and extension of the Thruput II optimization model for airlift mobility
RE Rosenthal, SF Baker, LT Weng, DF Fuller, D Goggins, AO Toy, ...
Military Operations Research, 55-74, 1997
341997
Single item lot-sizing problem for a warm/cold process with immediate lost sales
E Berk, AÖ Toy, Ö Hazır
European Journal of Operational Research 187 (3), 1251-1267, 2008
202008
Quality control chart design under Jidoka
E Berk, AÖ Toy
Naval Research Logistics (NRL) 56 (5), 465-477, 2009
192009
Dynamic lot sizing for a warm/cold process: heuristics and insights
AÖ Toy, E Berk
International Journal of Production Economics 145 (1), 53-66, 2013
122013
Energy systems and management
AN Bilge, AÖ Toy, ME Günay
Springer International Publishing, 2015
112015
Dynamic lot sizing problem for a warm/cold process
AÖ Toy, E Berk
IIE Transactions 38 (11), 1027-1044, 2006
112006
An overview of energy technologies for a sustainable future
AN Esen, Z Duzgit, AÖ Toy, ME Günay
Energy Systems and Management, 1-16, 2015
72015
Special control charts using intelligent techniques: EWMA control charts
B Aslan, Y Ekinci, AÖ Toy
Intelligent Decision Making in Quality Management: Theory and Applications …, 2016
52016
Route prioritization for an airlift mobility optimization model
AO Toy
Master’s thesis, Naval Postgraduate School, Monterey, CA, 1996
51996
Intelligent supply chains through implementation of digital twins
O Kulaç, B Ekren, AO Toy
Intelligent and Fuzzy Systems: Digital Acceleration and The New Normal 504 …, 2022
32022
Markovian Decision Process Modeling Approach for Intervention Planning of Partially Observable Systems Prone to Failures
O Karabağ, Ö Bulut, AÖ Toy
International Conference on Intelligent and Fuzzy Systems, 497-504, 2022
32022
Fuzzy heuristic solution approaches for the warm/cold lot sizing problem
A Altay, AO Toy, Y Ekinci
Applied Soft Computing 48, 691-702, 2016
32016
Performance Comparison of Meta-heuristics for the Multiblock Warehouse Order Picking Problem
Z Düzgit, AÖ Toy, AC Saner
International Journal of Industrial Engineering Theory, Applications and …, 2021
22021
An Implementation of Flexible Job Shop Scheduling Problem in a Metal Processing Company
AO Özkul, G Küçük, C Çelik, N Öztuna, M Demirkan, EÇ Nizam, ...
Digital Conversion on the Way to Industry 4.0: Selected Papers from ISPR2020 …, 2021
22021
Production Planning at a Chocolate Company: A Two-Phase Approach by Aggregation
Z Düzgit, AB Kuzuoğlu, H Kalelioğlu, H Kolay, MB Güler, S Akyol, AÖ Toy
Proceedings of the International Symposium for Production Research 2019, 169-181, 2020
22020
An efficient procedure for optimal maintenance intervention in partially observable multi-component systems
O Karabağ, Ö Bulut, AÖ Toy, MM Fadıloğlu
Reliability Engineering & System Safety 244, 109914, 2024
12024
A serial inventory system with lead-time-dependent backordering: A reduced-state approximation
E Berk, AÖ Toy
IISE Transactions 55 (3), 259-270, 2023
12023
Quality and production control with opportunities and exogenous random shocks
AÖ Toy
Ph.D. Dissertation, Bilkent University, 2005
12005
Capacity Expansion Through Bottleneck Analysis for an OEM Company
AA Bayraktar, G Coşkunseda, E Salman, AÖ Toy, NK Aygün
The International Symposium for Production Research, 718-732, 2023
2023
Algorithms for Multiple Autonomous Robotic Systems in Warehouse Order Picking Operations: A General Review
Z Duzgit, AO Toy
Global Joint Conference on Industrial Engineering and Its Application Areas, 1-9, 2022
2022
The system can't perform the operation now. Try again later.
Articles 1–20