Laurent Flindt Muller
Laurent Flindt Muller
Optivation
Verified email at optivation.dk
Title
Cited by
Cited by
Year
A hybrid adaptive large neighborhood search heuristic for lot-sizing with setup times
LF Muller, S Spoorendonk, D Pisinger
European Journal of Operational Research 218 (3), 614-623, 2012
582012
A solution approach based on Benders decomposition for the preventive maintenance scheduling problem of a stochastic large-scale energy system
R Lusby, LF Muller, B Petersen
Journal of Scheduling 16 (6), 605-628, 2013
272013
Fast and compact oracles for approximate distances in planar graphs
LF Muller, M Zachariasen
European Symposium on Algorithms, 657-668, 2007
252007
An adaptive large neighborhood search algorithm for the resource-constrained project scheduling problem
LF Muller
Proceedings of the VIII Metaheuristics International Conference (MIC), 2009
232009
An adaptive large neighborhood search algorithm for the multi-mode RCPSP
LF Muller
DTU Management, 2011
82011
An adaptive large neighborhood search algorithm for the multi-mode resouceconstrained project scheduling problem
LF Muller
Technical report, Department of Management Engineering, Technical University …, 2011
72011
A hybrid adaptive large neighborhood search algorithm applied to a lot-sizing problem
LF Muller, S Spoorendonk
DTU Management, 2010
72010
Separation and extension of cover inequalities for conic quadratic knapsack constraints with generalized upper bounds
A Atamtürk, LF Muller, D Pisinger
INFORMS Journal on Computing 25 (3), 420-431, 2013
62013
A Multi-mode Resource-Constrained Project Scheduling Problem with Stochastic Nonrenewable Resource Consumption,‖ DTU Management Engineering, Lyngby
LF Muller
Denmark, Technical Report, 2011
52011
A solution approach to the ROADEF/EURO 2010 challenge based on Benders' Decomposition
RM Lusby, LF Muller, B Petersen
DTU Management, 2010
52010
Separation and extension of cover inequalities for secondorder conic knapsack constraints with generalized upper bounds
A Atamtürk, LF Muller, D Pisinger
Technical report, Department of Management Engineering, Technical University …, 2011
42011
Robust long-term production planning
LF Muller
Technical University of Denmark, 2011
2011
A Multi-mode RCPSP with Stochas-tic Nonrenewable Resource Con-sumption
LF Muller
2011
A Multi-mode RCPSP with Stochastic Nonrenewable Resource Consumption
LF Muller
DTU Management, 2011
2011
The system can't perform the operation now. Try again later.
Articles 1–14