Follow
Purva Mujumdar
Purva Mujumdar
Assistant Professor
Verified email at sushantuniversity.edu.in
Title
Cited by
Cited by
Year
Design iteration in construction projects–Review and directions
P Mujumdar, JU Maheswari
Alexandria Engineering Journal 57 (1), 321-329, 2018
392018
Structured methodology for applying multiple domain matrices (MDM) to construction projects
P Mujumdar, P Muraleedharan, JU Maheswari
Proceedings of the 16th International DSM Conference, 299-308, 2014
102014
Application of Relationship Diagramming Method (RDM) for resource-constrained scheduling of linear construction projects
JU Maheswari, VPC Charlesraj, A Goyal, P Mujumdar
Procedia Engineering 123, 308-315, 2015
92015
A design iteration framework for construction projects
P Mujumdar, JU Maheswari
Proc. of the RICS Cobra, New Delhi, 2013
92013
A study on DSM partitioning through case study approach
P Mujumdar, S Bhattacharya, J Uma Maheswari
ICoRD’15–Research into Design Across Boundaries Volume 2: Creativity …, 2015
52015
Alternate beeline diagramming method network analysis for interdependent design entities
P Mujumdar, JU Maheswari
Engineering, Construction and Architectural Management 26 (1), 66-84, 2019
32019
A framework on causes and effects of design iterations
P Mujumdar, V Matsagar
Journal of The Institution of Engineers (India): Series A 98, 171-176, 2017
22017
BDM–MDM integrated solution concept for scheduling information-driven projects
JU Maheswari, P Mujumdar, SPS Padala, A Gwaskoti
Engineering, Construction and Architectural Management 29 (2), 1016-1037, 2021
12021
Integrated Framework for Automating the Structural Design Iteration
P Mujumdara, JU Maheswarib
ISARC. Proceedings of the International Symposium on Automation and Robotics …, 2015
12015
Design optimization of steel members using openstaad and genetic algorithm
P Mujumdar, V Matsagar
Advances in Structural Engineering: Mechanics, Volume One, 233-244, 2015
12015
A cloud-based solution for information and communication design iterations
P Mujumdar, JU Maheswari, A Kumar
4th World Congress on Information and Communication Technologies, December, 8-10, 0
1
Modeling design interdependency and iteration for multiple two-way information exchanges in construction projects
P Mujumdar
2017
Part VII: Managing Multiple Domains in Complex Projects: Structured Methodology for Applying Multiple Domain Matrices (MDM) to Construction Projects
P Mujumdar, P Muraleedharan, JU Maheswari
Risk and change management in complex systems, 297-308, 2014
2014
Resource-constrained project scheduling using Relationship Diagramming Method (RDM)
JU Maheswari, P Mujumdar, AGVPC Charlesraj
The system can't perform the operation now. Try again later.
Articles 1–14