Cost overrun in the Malaysian construction industry projects: A deeper insight
Z Shehu, IR Endut, A Akintoye, GD Holt
International journal of project management 32 (8), 1471-1480, 2014
2372014
Innovation in logistics services–halal logistics
HS Jaafar, IR Endut, N Faisol, EN Omar
1602011
Factors contributing to project time and hence cost overrun in the Malaysian construction industry
Z Shehu, IR Endut, A Akintoye
Journal of Financial Management of Property and Construction, 2014
1272014
Cost and time overruns of projects in Malaysia
IR Endut, A Akintoye, J Kelly
retrieved on August 21, 243-252, 2009
992009
The importance of collaboration in construction industry from contractors’ perspectives
SHA Rahman, IR Endut, N Faisol, S Paydar
Procedia-Social and Behavioral Sciences 129, 414-421, 2014
822014
The impact of value management implementation in Malaysia
A Jaapar, IR Endut, NAA Bari, R Takim
Journal of sustainable Development 2 (2), 210-219, 2009
642009
Exploration of 85th percentile operating speed model on horizontal curve: a case study for two-lane rural highways
SKS Abbas, MA Adnan, IR Endut
Procedia-Social and behavioral sciences 16, 352-363, 2011
492011
Analysis of characteristics affecting completion time for Malaysian construction projects
Z Shehu, GD Holt, IR Endut, A Akintoye
Built Environment Project and Asset Management, 2015
272015
Framework for minimising time overruns of Malaysian construction projects
IR Endut
Glasgow Caledonian University, 2008
252008
The utilization rates of pedestrian bridges in Malaysia
H Rizati, SZ Ishak, IR Endut
2013 IEEE business engineering and industrial applications colloquium (BEIAC …, 2013
232013
Relationship between duration and cost of Malaysian construction projects
IR Endut, A Akintoye, J Kelly
Proceedings of the International Conference in the Built Environment in the …, 2006
232006
Types of damages on flexible pavement for Malaysian Federal Road
NE Kordi, IR Endut, B Baharom
Proceeding of Malaysian Universities Transportation Research Forum and …, 2010
222010
Assessing pedestrian crossing risk at signalised intersection
R Hamidun, SZ Ishak, IR Endut
International Journal of Emerging Technology and Advanced Engineering 3 (1 …, 2013
172013
Malaysian contractors’ opinions towards international market expansion
CMM Isa, H Adnan, IR Endut, N Basrah
International Conference in the Built Environment in the 21st Century …, 2006
172006
Minimizing defects in building construction project
MIM Hasan, NN Abd Razak, IR Endut, SAA Samah, ARM Ridzuan, ...
Jurnal Teknologi 78 (5-2), 2016
152016
The material supply chain management in a construction project: A current scenario in the procurement process
S Hasim, MA Fauzi, Z Yusof, IR Endut, ARM Ridzuan
AIP Conference Proceedings 2020 (1), 020049, 2018
142018
Estimation of illegal crossing accident risk using stochastic petri nets
R Hamidun, NE Kordi, IR Endut, SZ Ishak, MFM Yusoff
Journal of Engineering Science and Technology 10 (Spec. Issue on Advances in …, 2015
142015
The quantification of local construction waste for the current construction waste management practices: A case study in Klang Valley
RNHRM Noor, ARM Ridzuan, IR Endut, B Noordin, Z Shehu, AHA Ghani
2013 IEEE Business Engineering and Industrial Applications Colloquium (BEIAC …, 2013
142013
Application of lean model to reduce waste of time in construction Case study of concreting task in Malaysia
A Lajevardi, IR Endut, S Paydar
2011 IEEE Colloquium on Humanities, Science and Engineering, 345-350, 2011
142011
A case study on skeleton constituent as earth related constructive form
S Rahman, N Rahim, R Anwar, OH Hassan, AMM Johan
2013 IEEE Business Engineering and Industrial Applications Colloquium (BEIAC …, 2013
112013