Follow
Mohammad Mohammadi
Mohammad Mohammadi
PhD student at KTH
Verified email at kth.se - Homepage
Title
Cited by
Cited by
Year
Rock bolt supporting factor: rock bolting capability of rock mass
M Mohammadi, MF Hossaini, H Bagloo
Bulletin of engineering geology and the environment 76, 231-239, 2017
342017
Use of fuzzy set theory for minimizing overbreak in underground blasting operations–A case study of Alborz Tunnel, Iran
M Mohammadi, MF Hossaini, B Mirzapour, N Hajiantilaki
International Journal of Mining Science and Technology 25 (3), 439-445, 2015
342015
Modification of rock mass rating system: Interbedding of strong and weak rock layers
M Mohammadi, MF Hossaini
Journal of Rock Mechanics and Geotechnical Engineering 9 (6), 1165-1170, 2017
272017
On the selection of an appropriate excavation pattern for urban tunnels with big cross-section: A case study
R Bolghonabai, MF Hossaini, M Mohammadi, A Nazem
International Journal of Mining and Geo-Engineering 49 (2), 297-307, 2015
102015
Probabilistic Time Estimation of Tunneling Projects: The Uri Headrace Tunnel
M Mohammadi, J Spross, H Stille
Rock Mechanics and Rock Engineering, 2022
92022
Probabilistic time estimation in tunnel projects
M Mohammadi
KTH Royal Institute of Technology, 2021
62021
Causes of Overbreak in Tunneling: A case study of the Alborz Tunnel
MF Hossaini, M Mohammadi, J Ghadimi, A Abbasi
52016
Models to Analyze Risk in Time and Cost Estimation of Tunneling Projects
M Mohammadi, J Spross, H Stille
Geotechnical and Geological Engineering, https://doi.org/10.1007/s10706-023 …, 2023
22023
Risk model for understanding uncertainty in time and cost estimation in tunneling phases
M Mohammadi, J Spross
Under­ground Construction Prague 2023, 2023
22023
Causes of Dynamic Overbreak and Control Measures Taken at the Alborz Tunnel, Iran
MF Hossaini, M Mohammadi, N Hajiantilaki, A Tavallaie
22015
Mot rättvisare riskdelning i tunnelprojekt
M Mohammadi, J Spross
Bygg & teknik, 2021
12021
Minimising Mucking Time by Prediction of Muckpile Top Size in Tunnel Blasting: A Case Study
MF Hossaini, M Mohammadi, B Mirzapour, N Hajiantilaki
12014
Probabilistic time estimation of tunnels constructed with multiple headings
JS Mohammad Mohammadi
Tunnelling and Underground Space Technology 153 (https://doi.org/10.1016/j …, 2024
2024
Risk Management in Tunneling Projects: Estimation and Planning
M Mohammadi
Doctoral dissertation, KTH Royal Institute of Technology, 2024
2024
Modeling uncertainty of activity duration in probabilistic time estimation of tunneling projects
JS Mohammad Mohammadi
Proceedings of 15th ISRM Congress 2023 & 72nd Geomechanics Colloquium …, 2023
2023
Application of Rock Mass Rating system in underground intersections
M Mohammadi
11th Conference of Asian Rock Mechanics Society, 2021
2021
Revision of using Rock Quality Designation (RQD) in Rock Mass Rating System (RMR)–a Case Study of Alborz Tunnel
H Farajollahi, MH Khosravi, M Mohammadi
Tunneling & Underground Space Engineering 9 (2), 137-148, 2020
2020
Interpretation of rock mass behavior via “multiple graph” approach: Adit P-CP9 of the Alborz Tunnel
MA Mohammad Farouq Hossaini, Mohammad Mohammadi
The Australasian Institute of Mining and Metallurgy and Mine Managers …, 2018
2018
Charge Distribution Pattern For Different Zones In Tunnel Blasting Operations: Case Study Of The Alborz Tunnel
RBNH Mohammad Mohammadi, Mohammad Farouq Hossaini, Saeed Alekay Taleghan
24th International Mining Congress and Exhibition of Turkey, Antalya, Turkey …, 2015
2015
An Approach for Determination of Shotcrete Thickness in Underground Structures
M Mohammadi, M Askari, MF Hossaini
The system can't perform the operation now. Try again later.
Articles 1–20