Rock bolt supporting factor: rock bolting capability of rock mass M Mohammadi, MF Hossaini, H Bagloo Bulletin of engineering geology and the environment 76, 231-239, 2017 | 34 | 2017 |
Use of fuzzy set theory for minimizing overbreak in underground blasting operations–A case study of Alborz Tunnel, Iran M Mohammadi, MF Hossaini, B Mirzapour, N Hajiantilaki International Journal of Mining Science and Technology 25 (3), 439-445, 2015 | 34 | 2015 |
Modification of rock mass rating system: Interbedding of strong and weak rock layers M Mohammadi, MF Hossaini Journal of Rock Mechanics and Geotechnical Engineering 9 (6), 1165-1170, 2017 | 27 | 2017 |
On the selection of an appropriate excavation pattern for urban tunnels with big cross-section: A case study R Bolghonabai, MF Hossaini, M Mohammadi, A Nazem International Journal of Mining and Geo-Engineering 49 (2), 297-307, 2015 | 10 | 2015 |
Probabilistic Time Estimation of Tunneling Projects: The Uri Headrace Tunnel M Mohammadi, J Spross, H Stille Rock Mechanics and Rock Engineering, 2022 | 9 | 2022 |
Probabilistic time estimation in tunnel projects M Mohammadi KTH Royal Institute of Technology, 2021 | 6 | 2021 |
Causes of Overbreak in Tunneling: A case study of the Alborz Tunnel MF Hossaini, M Mohammadi, J Ghadimi, A Abbasi | 5 | 2016 |
Models to Analyze Risk in Time and Cost Estimation of Tunneling Projects M Mohammadi, J Spross, H Stille Geotechnical and Geological Engineering, https://doi.org/10.1007/s10706-023 …, 2023 | 2 | 2023 |
Risk model for understanding uncertainty in time and cost estimation in tunneling phases M Mohammadi, J Spross Underground Construction Prague 2023, 2023 | 2 | 2023 |
Causes of Dynamic Overbreak and Control Measures Taken at the Alborz Tunnel, Iran MF Hossaini, M Mohammadi, N Hajiantilaki, A Tavallaie | 2 | 2015 |
Mot rättvisare riskdelning i tunnelprojekt M Mohammadi, J Spross Bygg & teknik, 2021 | 1 | 2021 |
Minimising Mucking Time by Prediction of Muckpile Top Size in Tunnel Blasting: A Case Study MF Hossaini, M Mohammadi, B Mirzapour, N Hajiantilaki | 1 | 2014 |
Probabilistic time estimation of tunnels constructed with multiple headings JS Mohammad Mohammadi Tunnelling and Underground Space Technology 153 (https://doi.org/10.1016/j …, 2024 | | 2024 |
Risk Management in Tunneling Projects: Estimation and Planning M Mohammadi Doctoral dissertation, KTH Royal Institute of Technology, 2024 | | 2024 |
Modeling uncertainty of activity duration in probabilistic time estimation of tunneling projects JS Mohammad Mohammadi Proceedings of 15th ISRM Congress 2023 & 72nd Geomechanics Colloquium …, 2023 | | 2023 |
Application of Rock Mass Rating system in underground intersections M Mohammadi 11th Conference of Asian Rock Mechanics Society, 2021 | | 2021 |
Revision of using Rock Quality Designation (RQD) in Rock Mass Rating System (RMR)–a Case Study of Alborz Tunnel H Farajollahi, MH Khosravi, M Mohammadi Tunneling & Underground Space Engineering 9 (2), 137-148, 2020 | | 2020 |
Interpretation of rock mass behavior via “multiple graph” approach: Adit P-CP9 of the Alborz Tunnel MA Mohammad Farouq Hossaini, Mohammad Mohammadi The Australasian Institute of Mining and Metallurgy and Mine Managers …, 2018 | | 2018 |
Charge Distribution Pattern For Different Zones In Tunnel Blasting Operations: Case Study Of The Alborz Tunnel RBNH Mohammad Mohammadi, Mohammad Farouq Hossaini, Saeed Alekay Taleghan 24th International Mining Congress and Exhibition of Turkey, Antalya, Turkey …, 2015 | | 2015 |
An Approach for Determination of Shotcrete Thickness in Underground Structures M Mohammadi, M Askari, MF Hossaini | | |