Follow
Reini Wirahadikusumah
Reini Wirahadikusumah
Institut Teknologi Bandung
No verified email
Title
Cited by
Cited by
Year
Challenging issues in modeling deterioration of combined sewers
R Wirahadikusumah, D Abraham, T Iseley
Journal of infrastructure systems 7 (2), 77-84, 2001
2702001
Factors relating to labor productivity affecting the project schedule performance in Indonesia
A Soekiman, KS Pribadi, BW Soemardi, RD Wirahadikusumah
Procedia engineering 14, 865-873, 2011
2182011
Assessment technologies for sewer system rehabilitation
R Wirahadikusumah, DM Abraham, T Iseley, RK Prasanth
Automation in Construction 7 (4), 259-270, 1998
2181998
Optimization modeling for sewer network management
DM Abraham, R Wirahadikusumah, TJ Short, S Shahbahrami
Journal of construction engineering and management 124 (5), 402-410, 1998
1171998
Konsep Earned Value untuk Pengelolaan Proyek Konstruksi
BW Soemardi, RD Wirahadikusumah, M Abduh, N Pujoartanto
Makalah. Fakultas Teknik Sipil dan Lingkungan, Institut Teknologi Bandung …, 2007
762007
Learning from past earthquake disasters: The need for knowledge management system to enhance infrastructure resilience in Indonesia
KS Pribadi, M Abduh, RD Wirahadikusumah, NR Hanifa, M Irsyam, ...
International Journal of Disaster Risk Reduction 64, 102424, 2021
652021
A comprehensive review of disputes prevention and resolution in construction projects
WS Alaloul, MW Hasaniyah, BA Tayeh
MATEC web of conferences 270, 05012, 2019
552019
Development of prediction models for sewer deterioration
DM Abraham
Proceedings of Durability of Building Materials and Components 8 1, 1257, 1999
541999
Tantangan Masalah Keselamatan dan Kesehatan Kerja pada Proyek Konstruksi di Indonesia
RD Wirahadikusumah
Fakultas Teknik Sipil dan Lingkungan, Institut Teknologi Bandung (www. ftsl …, 2007
472007
Markov decision process for sewer rehabilitation
R Wirahadikusumah, DM Abraham, J Castello
Engineering, construction and architectural management 6 (4), 358-370, 1999
411999
Application of dynamic programming and simulation for sewer management
R Wirahadikusumah, DM Abraham
Engineering, Construction and Architectural Management 10 (3), 193-208, 2003
392003
A readiness assessment model for Indonesian contractors in implementing sustainability principles
RD Wirahadikusumah, D Ario
International Journal of Construction Management 15 (2), 126-136, 2015
292015
Pengembangan sistem Earned Value untuk pengelolaan proyek konstruksi di Indonesia
BW Soemardi, RD Wirahadikusumah, M Abduh
Laporan Hasil Riset, ITB, 2006
282006
Introducing sustainability principles into the procurement of construction works–case of Indonesian developers
R Wirahadikusumah, M Abduh, Y Messah, M Aulia
International journal of construction management 21 (9), 932-944, 2021
252021
Licensing construction workforce: Indonesia's effort on improving the quality of national construction industry
RD Wirahadikusumah, KS Pribadi
Engineering, Construction and Architectural Management 18 (5), 431-443, 2011
252011
Estimasi konsumsi energi dan emisi gas rumah kaca pada pekerjaan pengaspalan jalan
RD Wirahadikusumah, HP Sahana
Jurnal Teknik Sipil ITB 19 (1), 25-36, 2012
242012
Indonesian construction supply chains cost structure and factors: a case study of two projects
M Abduh, BW Soemardi, RD Wirahadikusumah
Journal of Civil Engineering and Management 18 (2), 209-216, 2012
212012
Assessing risk management capability of public sector organizations related to PPP scheme development for water supply in Indonesia
MH Pangeran, KS Pribadi, RD Wirahadikusumah, S Notodarmojo
Civil Engineering Dimension 14 (1), 26-35, 2012
212012
Integrating sensing technologies for underground utility assessment
DM Abraham, T Iseley, RK Prasanth, R Wirahadikusumah
Infrastructure condition assessment: Art, science, and practice, 316-325, 1997
201997
Performance-based contracting for roads–experiences of Australia and Indonesia
R Wirahadikusumah, B Susanti, V Coffey, C Adighibe
Procedia Engineering 125, 5-11, 2015
192015
The system can't perform the operation now. Try again later.
Articles 1–20