Combination of project cost forecasts in earned value management BC Kim, KF Reinschmidt Journal of Construction Engineering and Management 137 (11), 958-966, 2011 | 131 | 2011 |
Probabilistic forecasting of project duration using Kalman filter and the earned value method BC Kim, KF Reinschmidt Journal of Construction Engineering and Management 136 (8), 834-843, 2010 | 113 | 2010 |
Forecasting project progress and early warning of project overruns with probabilistic methods BC Kim Texas A&M University, 2007 | 55 | 2007 |
Sensitivity of earned value schedule forecasting to S-curve patterns BC Kim, HJ Kim Journal of Construction Engineering and Management 140 (7), 04014023, 2014 | 49 | 2014 |
Probabilistic evaluation of cost performance stability in earned value management BC Kim Journal of Management in Engineering 32 (1), 04015025, 2016 | 41 | 2016 |
Integrating risk assessment and actual performance for probabilistic project cost forecasting: A second moment Bayesian model BC Kim IEEE Transactions on Engineering Management 62 (2), 158 - 170, 2015 | 40 | 2015 |
Dynamic control thresholds for consistent earned value analysis and reliable early warning BC Kim Journal of Management in Engineering 31 (5), 2015 | 32 | 2015 |
What CPI = 0.85 Really Means: A Probabilistic Extension of the Estimate at Completion BC Kim, JK Pinto Journal of Management in Engineering 35 (2), 2019 | 26 | 2019 |
Cost performance as a stochastic process: EAC projection by Markov Chain simulation J Du, BC Kim, D Zhao Journal of Construction Engineering and Management 142 (6), 04016009, 2016 | 26 | 2016 |
Improving the accuracy and operational predictability of project cost forecasts: an adaptive combination approach BC Kim, YH Kwak Production Planning & Control 29 (9), 743-760, 2018 | 17 | 2018 |
Probability distribution of the project payback period using the equivalent cash flow decomposition BC Kim, E Shim, KF Reinschmidt The Engineering Economist 58 (2), 112-136, 2013 | 16 | 2013 |
A second moment approach to probabilistic IRR using Taylor series BC Kim, KF Reinschmidt The Engineering Economist 57 (1), 1-19, 2012 | 15 | 2012 |
Dependence Modeling for Large-scale Project Cost and Time Risk Assessment: Additive Risk Factor Approaches BC Kim IEEE Transactions on Engineering Management 70 (2), 417-436, 2023 | 13 | 2023 |
Credibility evaluation of project duration forecast using forecast sensitivity and forecast-risk compatibility BC Kim, SJ Kim Journal of Construction Engineering and Management 141 (8), 2015 | 11 | 2015 |
An S-curve Bayesian model for forecasting probabilistic distributions on project duration and cost at completion BC Kim, K Reinschmidt CME 25 Conference Construction Management and Economics, 1449, 2007 | 11 | 2007 |
Probabilistic performance risk evaluation of infrastructure projects BC Kim Vulnerability, Uncertainty, and Risk: Analysis, Modeling, and Management …, 2011 | 9 | 2011 |
Multi-factor dependence modelling with specified marginals and structured association in large-scale project risk assessment BC Kim European Journal of Operational Research 296 (2), 679-695, 2022 | 5 | 2022 |
Batch-size based repetitive scheduling method (BRSM) E Shim, BC Kim International Journal of Construction Education and Research 10 (2), 140-156, 2014 | 5 | 2014 |
Multi-factor association dependence modelling for project risk analysis BC Kim MethodsX 8, 101443, 2021 | 1 | 2021 |
Cash-flow simulation game for teaching project cash-flow forecasting E Shim, BC Kim, S Kim Technology Interface International Journal 13 (2), 12-19, 2013 | | 2013 |