Follow
Dr Konstantinos Kirytopoulos
Title
Cited by
Cited by
Year
Project Complexity and Risk Management (ProCRiM): Towards modelling project complexity driven risk paths in construction projects
A Qazi, J Quigley, A Dickson, K Kirytopoulos
International journal of project management 34 (7), 1183-1198, 2016
3612016
Integrating sustainability indicators into project management: The case of construction industry
M Stanitsas, K Kirytopoulos, V Leopoulos
Journal of Cleaner Production 279, 123774, 2021
1832021
Supplier selection in pharmaceutical industry: an analytic network process approach
K Kirytopoulos, V Leopoulos, D Voulgaridou
Benchmarking: An International Journal 15 (4), 494-516, 2008
1722008
Facilitating sustainability transition through serious games: A systematic literature review
M Stanitsas, K Kirytopoulos, E Vareilles
Journal of cleaner production 208, 924-936, 2019
1652019
Risk management for SMEs: Tools to use and how
VN Leopoulos, KA Kirytopoulos, C Malandrakis
Production Planning & Control 17 (3), 322-332, 2006
1122006
Introducing the STAMP method in road tunnel safety assessment
K Kazaras, K Kirytopoulos, A Rentizelas
Safety science 50 (9), 1806-1817, 2012
982012
Optimism bias within the project management context: A systematic quantitative literature review
J Prater, K Kirytopoulos, T Ma
International Journal of Managing Projects in Business 10 (2), 370-385, 2017
722017
Challenges and competencies for project management in the Australian public service
C Blixt, K Kirytopoulos
International Journal of Public Sector Management 30 (3), 286-300, 2017
642017
Integrated management systems: moving from function to organisation/decision view
V Leopoulos, D Voulgaridou, E Bellos, K Kirytopoulos
The TQM Journal 22 (6), 594-628, 2010
592010
Taxonomy of risks in PPP transportation projects: a systematic literature review
PT Le, K Kirytopoulos, N Chileshe, R Rameezdeen
International Journal of Construction Management 22 (2), 166-181, 2022
522022
A process reference model for claims management in construction supply chains: The contractors’ perspective
DRI Stamatiou, KA Kirytopoulos, ST Ponis, S Gayialis, I Tatsiopoulos
International Journal of Construction Management 19 (5), 382-400, 2019
512019
Multiple sourcing strategies and order allocation: an ANP‐AUGMECON meta‐model
K Kirytopoulos, V Leopoulos, G Mavrotas, D Voulgaridou
Supply Chain Management: An International Journal 15 (4), 263-276, 2010
512010
Proactive assessment of breaches of safety constraints and causal organizational breakdowns in complex systems: A joint STAMP–VSM framework for safety assessment
K Kazaras, T Kontogiannis, K Kirytopoulos
Safety science 62, 233-247, 2014
482014
Holistic investment assessment: optimization, risk appraisal and decision making
G Tziralis, K Kirytopoulos, A Rentizelas, I Tatsiopoulos
Managerial and decision economics 30 (6), 393-403, 2009
482009
Evaluating the role of risk assessment for road tunnel fire safety: A comparative review within the EU
P Ntzeremes, K Kirytopoulos
Journal of traffic and transportation engineering (English edition) 6 (3 …, 2019
462019
Investigating the significance of sustainability indicators for promoting sustainable construction project management
M Stanitsas, K Kirytopoulos
International Journal of Construction Management 23 (3), 434-448, 2023
442023
The three pillars of sustainability and agile project management: How do they influence each other
FJ Gomes Silva, K Kirytopoulos, L Pinto Ferreira, JC Sá, G Santos, ...
Corporate Social Responsibility and Environmental Management 29 (5), 1495-1512, 2022
432022
Applying a stochastic-based approach for developing a quantitative risk assessment method on the fire safety of underground road tunnels
P Ntzeremes, K Kirytopoulos
Tunnelling and underground space technology 81, 619-631, 2018
412018
An analytic network process approach for sales forecasting
D Voulgaridou, K Kirytopoulos, V Leopoulos
Operational Research 9, 35-53, 2009
412009
Exploring driving habits and safety critical behavioural intentions among road tunnel users: A questionnaire survey in Greece
K Kirytopoulos, K Kazaras, P Papapavlou, P Ntzeremes, I Tatsiopoulos
Tunnelling and Underground Space Technology 63, 244-251, 2017
392017
The system can't perform the operation now. Try again later.
Articles 1–20