Follow
Johannes Veie
Johannes Veie
NPRA
Verified email at vegvesen.no
Title
Cited by
Cited by
Year
Coupled wind and wave load analyses of multi-span suspension bridge supported by floating foundations
M Papinutti, K Aas-Jakobsen, LH Kaasa, A Bruer, MH Marley, J Veie, ...
Proceedings of 39th IABSE Symposium, 3052-3059, 2017
122017
Analysis of tether anchored floating suspension bridge subjected to large ship collisions
OH Moe, Y Sha, J Veie, J Amdahl
Procedia engineering 199, 2488-2493, 2017
112017
Bridge crossings at Sognefjorden–ship collision risk studies
MG Hansen, S Randrup-Thomsen, T Askeland, M Ask, L Skorpa, ...
Collision and grounding of ships and offshore structures. CRC Press/Taylor …, 2013
92013
Steien Network Arch Bridge
J Veie, RB Abrahamsen, E Rønnekleiv
2nd International Conference on Timber Bridges, 2013
82013
Concept overview of a multi-span suspension bridge on floating foundations
B Villoria, SH Holtberget, D Cato, J Veie, P Jena, P Madsen
IABSE Symposium Report 109 (12), 3030-3037, 2017
72017
Multi span suspension bridge on floating foundations–behaviour under operation
B Villoria, J Veie, SH Holtberget, P Jena
IABSE Symposium: Engineering the Future, Vancouver, Canada, 21-23 September …, 2017
72017
Comparison of Alternative Floater concepts for a 2-span Suspension Bridge supported by a Tension Leg Platform
M Papinutti, S Jörg, A Bruer, HM Marley, J Veie, HS Helgren
Stockholm: IABSE, 2016
62016
Prediction of Wave and Wind induced Dynamic Response in Time Domain using RM Bridge
J Stampler, J Sello, M Papinutti, A Bruer, M Marley, J Veie, SH Holtberget
Geneva, Switzerland: IABSE conference, 2015
62015
Three span floating suspension bridge crossing the Bjørnafjord
J Veie, SH Holtberget
Conference on Multi-Span Large Bridges, 1–3 July 2015, Porto, Portugal, 373-380, 2015
62015
How to cross the 7500 m wide Boknafjord
V Oosterlaak, A Bruer, J Veie
Strait Crossings, 2013
32013
Crossing the Bjørnafjord with a multi-span suspension bridge on floating foundations–Challenges in design
SH Holtberget, J Veie, P Jena
IABSE Congress: Challenges in Design and Construction of an Innovative and …, 2016
22016
Crossing the Bjørnafjord with a multi-span suspension bridge on floating foundations–Concept Overview
J Veie, SH Holtberget, P Jena
IABSE Congress: Challenges in Design and Construction of an Innovative and …, 2016
22016
Risk assessment of ship allision in extreme fjord crossings
T Askeland, C Dørum, ME Eidem, S Randrup-Thomsen, PT Pedersen, ...
31st European Safety and Reliability Conference, 614-621, 2021
12021
The development of timber as a construction material for bridges in Norway
J Veie, TA Stensby, T Dyken, Y Aartun
IABSE Symposium: Engineering the Future, Vancouver, Canada, 21-23 September …, 2017
12017
span floating suspension bridge crossing the Bjørnafjord
J Veie, SH Holtberget
Multi-Span Large Bridges, 393-400, 2015
2015
Musical mission: with winter flood waters receding, construction of the superstructure of the Harpe bridge is due to restart
PN Larsen, A Christensen, J Veie
Bridge Design and Engineering, 66-69, 2015
2015
The Choice of Materials for the E39 Fjord Crossing Project
SH Holtberget, X Xiang, C Dørum, J Veie, A Minoretti
Nordic Concrete Research 61 (2), 39-51, 0
Wetterfester Stahl in tragenden Teilen und im Geländer von Holzbrücken
H Kepp, SN Straßenverwaltung, T Dyken, TA Stensbye, J Veie
The system can't perform the operation now. Try again later.
Articles 1–18