Follow
Ibrahim I Falqi
Ibrahim I Falqi
Associate Professor of Construction Project Management, King Khalid University
Verified email at kku.edu.sa - Homepage
Title
Cited by
Cited by
Year
Modeling groundwater potential zone in a semi-arid region of Aseer using fuzzy-AHP and geoinformation techniques
J Mallick, RA Khan, M Ahmed, SD Alqadhi, M Alsubih, I Falqi, MA Hasan
Water 11 (12), 2656, 2019
1552019
Delays in project completion: a comparative study of construction delay factors in Saudi Arabia and the United Kingdom
II Falqi
MSc. Thesis, School of the Built Environment, Heriot-Watt University, 2004
572004
Evaluating the NDVI–rainfall relationship in Bisha watershed, Saudi Arabia using non-stationary modeling technique
J Mallick, MK AlMesfer, VP Singh, II Falqi, CK Singh, M Alsubih, NB Kahla
Atmosphere 12 (5), 593, 2021
352021
Evaluation of the success of industry 4.0 digitalization practices for sustainable construction management: Chinese construction industry
M Sajjad, A Hu, A Waqar, II Falqi, SH Alsulamy, AS Bageis, AM Alshehri
Buildings 13 (7), 1668, 2023
292023
Siliceous concrete materials management for sustainability using Fuzzy-TOPSIS Approach
II Falqi, M Ahmed, J Mallick
Applied Sciences 9 (17), 3457, 2019
242019
Assessment of barriers to robotics process automation (RPA) implementation in safety management of tall buildings
A Waqar, I Othman, II Falqi, HR Almujibah, AM Alshehri, SH Alsulamy, ...
Buildings 13 (7), 1663, 2023
192023
Environmental performance evaluation and analysis using ISO 14031 guidelines in construction sector industries
I Falqi, S Alsulamy, M Mansour
Sustainability 12 (5), 1774, 2020
182020
Spatial stochastic model for predicting soil organic matter using remote sensing data
J Mallick, M Ahmed, SD Alqadhi, II Falqi, M Parayangat, CK Singh, ...
Geocarto International 37 (2), 413-444, 2022
112022
Knowledge Capture and Retrieval in Construction Projects
II Falqi
PhD. Thesis, School of the Built Environment, Heriot-Watt University, 2011
102011
An integrated structural equation modeling and analytic hierarchy process approach to prioritize investment in the construction industry to achieve sustainable development in …
M Mansour, S Dawood, I Falqi
Polish Journal of Environmental Studies 29 (3), 2020
92020
Behavioral differences towards internal and external factors in making the bid/no-bid decision
A Bageis, II Falqi, A Alshehri, S Alsulamy, TA Alsahli
Civil Engineering Journal 5 (5), 1189-1196, 2019
82019
Analyzing the implementation of environmental laws in the Saudi Arabian construction industry.
MAA Mansour, SDA Khadar, IIA Falqi
Applied Ecology & Environmental Research 17 (2), 2019
82019
Implementing ISO 14001 and Environmental Performance Evaluation: A Logistic Regression Model
S Alsulamy, I Falqi, M Mansour, S Dawood, A Alshehri
Transactions of FAMENA 45 (3), 87-100, 2021
42021
Environmental performance evaluation and analysis using ISO 14031 guidelines in construction sector industries. Sustainability, 12 (5), 1774
I Falqi, S Alsulamy, M Mansour
22020
Delays in Project Completion: A comparative study of construction delay factors in
II Falqi
Saudi Arabia and the United Kingdom, available online: http://www. saedin …, 2004
22004
Delays in Project Completionௗ: A comparative study of construction delay factors in Saudi Arabia and the United Kingdom. 2004
II Falqi
September, 0
2
Retrieving Beneficial Outcomes through Increased Level of Awareness about Value Management in Saudi Construction Industry A Survey-based Approach
AM Alshehri, II Falqi, AS Bageis, S Alsulamy
International Journal of Engineering Research & Technology(IJERT) 8 (03), 2019
12019
Knowledge Management in Projectized organizations
II Falqi
4th Saudi Project Management Conference, Towards a Professional Project …, 2015
2015
Project Review Based Knowledge Management Practices
II Falqi, C Fortune
6th International Postgraduate Research Conference in the Built and Human …, 2006
2006
The system can't perform the operation now. Try again later.
Articles 1–19