Follow
Nelson Morales
Title
Cited by
Cited by
Year
Aggregation heuristic for the open-pit block scheduling problem
E Jélvez, N Morales, P Nancel-Penard, J Peypouquet, P Reyes
European Journal of Operational Research 249 (3), 1169-1177, 2016
872016
Hardness and approximation of gathering in static radio networks
JC Bermond, J Galtier, R Klasing, N Morales, S Perennes
Parallel Processing Letters 16 (02), 165-183, 2006
852006
Incorporation of geometallurgical attributes and geological uncertainty into long-term open-pit mine planning
N Morales, S Seguel, A Cáceres, E Jélvez, M Alarcón
Minerals 9 (2), 108, 2019
622019
On the complexity of bandwidth allocation in radio networks
R Klasing, N Morales, S Pérennes
Theoretical Computer Science 406 (3), 225-239, 2008
492008
A simulation–optimization framework for short-term underground mine production scheduling
F Manríquez, J Pérez, N Morales
Optimization and Engineering 21, 939-971, 2020
372020
A new hybrid heuristic algorithm for the Precedence Constrained Production Scheduling Problem: A mining application
E Jélvez, N Morales, P Nancel-Penard, F Cornillier
Omega 94, 102046, 2020
322020
Stochastic open-pit mine production scheduling: A case study of an iron deposit
M Maleki, E Jélvez, X Emery, N Morales
Minerals 10 (7), 585, 2020
292020
Panel caving scheduling under precedence constraints considering mining system
M Smoljanovic, E Rubio, N Morales
35th APCOM Symposium, Wollongong, NSW, Australia, 407-417, 2011
282011
A mathematical model for the scheduling and definition of mining cuts in short-term mine planning
G Nelis, N Morales
Optimization and Engineering 23 (1), 233-257, 2022
232022
A new model for automated pushback selection
E Jélvez, N Morales, H Askari-Nasab
Computers & Operations Research 115, 104456, 2020
212020
Open pit mine planning considering geomechanical fundamentals
A Parra, N Morales, J Vallejos, PMV Nguyen
International Journal of Mining, Reclamation and Environment 32 (4), 221-238, 2018
212018
Optimizing pushback design considering minimum mining width for open pit strategic planning
P Nancel-Penard, N Morales
Engineering Optimization 54 (9), 1494-1508, 2022
182022
Optimizing open-pit block scheduling with exposed ore reserve
J Saavedra-Rosas, E Jeivez, J Amaya, N Morales
Journal of the Southern African Institute of Mining and Metallurgy 116 (7 …, 2016
172016
A two-stage stochastic model for open pit mine planning under geological uncertainty
E Moreno, X Emery, M Goycoolea, N Morales, G Nelis
Proceedings of the 38th International Symposium on the Application of …, 2017
162017
Short-term open-pit production scheduling optimizing multiple objectives accounting for shovel allocation in stockpiles
F Manríquez, H González, N Morales
Optimization and Engineering 24 (1), 681-707, 2023
152023
Value-optimal design of ramps in open pit mining
P Nancel-Penard, A Parra, N Morales, C Díaz, E Widzyk-Capehart
Archives of Mining Sciences, 399-413-399-413, 2019
142019
Footprint and economic envelope calculation for block/panel caving mines under geological uncertainty
E Vargas, N Morales, X Emery
142013
Gathering in specific radio networks
JC Bermond, J Galtier, R Klasing, N Morales, S Pérennes
AlgoTel'2006-8èmes Rencontres Francophones sur les Aspects Algorithmiques …, 2006
142006
Comparison of different approaches to strategic open-pit mine planning under geological uncertainty
G Nelis, N Morales, E Widzyk-Capehart
Proceedings of the 27th International Symposium on Mine Planning and …, 2019
132019
Increasing the value and feasibility of open pit plans by integrating the mining system into the planning process
N Morales, P Reyes
Journal of the Southern African Institute of Mining and Metallurgy 116 (7 …, 2016
132016
The system can't perform the operation now. Try again later.
Articles 1–20