Follow
Olafur S. Haraldsson
Olafur S. Haraldsson
Other namesÓlafur Sveinn Haraldsson
Head of Icelandic Road and Coastal Administration Research Department / Adjunct Associate Professor
Verified email at hi.is
Title
Cited by
Cited by
Year
Seismic resistance of socket connection between footing and precast column
OS Haraldsson, TM Janes, MO Eberhard, JF Stanton
Journal of Bridge Engineering 18 (9), 910-919, 2013
1512013
Accelerated bridge construction in Washington State: From research to practice
B Khaleghi, E Schultz, S Seguirant, L Marsh, O Haraldsson, M Eberhard, ...
PCI J 57 (4), 34-49, 2012
1232012
Measures of the seismic vulnerability of reinforced concrete buildings in Haiti
P O'Brien, M Eberhard, O Haraldsson, A Irfanoglu, D Lattanzi, S Lauer, ...
Earthquake Spectra 27 (1_suppl1), 373-386, 2011
522011
Unbonded pretensioned columns for accelerated bridge construction in seismic regions
PM Davis, TM Janes, OS Haraldsson, MO Eberhard, JF Stanton
Journal of Bridge Engineering 22 (5), 04017003, 2017
362017
Bridge column maximum drift estimation via computer vision
D Lattanzi, GR Miller, MO Eberhard, OS Haraldsson
Journal of Computing in Civil Engineering 30 (4), 04015051, 2016
352016
Precast bent system for high seismic regions: Laboratory tests of column-to-footing socket connections
O Haraldsson, TM Janes, MO Eberhard, JF Stanton
United States. Federal Highway Administration, 2013
122013
The Haiti earthquake database
N Sedra, M Eberhard, A Irfanoglu, AB Matamoros, S Pujol, OS Haraldsson, ...
NEEShub Database, 2010
92010
Precast Bent System for High Seismic Regions, Appendix A: Design Provisions
ML Marsh, SJ Stringer, JF Stanton, MO Eberhard, O Haraldsson, HV Tran, ...
United States. Federal Highway Administration, 2013
82013
Seismic resistance of precast concrete bridge columns made with unbonded pre-tensioning and hybrid fiber reinforced concrete
O Haraldsson, M Schoettler, G Finnsson, P Davis, J Stanton, M Eberhard
Proc., 7th National Seismic Conf. on Bridges and Highways, 2013
82013
Laboratory tests of column-to-footing socket connections
O Haraldsson, TM Janes, MO Eberhard, JF Stanton
Highways for LIFE Technology Partnership Program, 2011
82011
Spread Footing Socket Connections for Precast Columns
OS Haraldsson
University of Washington, 2011
62011
A precast bridge bent system for seismic regions
ML Marsh, JF Stanton, MO Eberhard, O Haraldsson, B Khaleghi
Technical Report DTFH61-09, 2010
62010
A precast concrete bridge bent for seismic regions
OS Haraldsson, JBK Pang, JF Stanton, MO Eberhard
Proc., Special Int. Workshop on Seismic Connection Details for Segmental …, 2009
62009
A pre-tensioned, rocking bridge bent for ABC in seismic regions
J Stanton, M Eberhard, D Sanders, T Thonstad, J Schaefer, B Kennedy, ...
10th National Conference in Earthquake Engineering: Frontiers of Earthquake …, 2014
42014
A Pre-Tensioned Bridge Bent System for Accelerated Bridge Construction
O Haraldsson
32015
Accelerating Bridge Construction to Reduce Congestion
O Haraldsson, MO Eberhard, JF Stanton, M Berry
University of Washington, 2011
32011
Development of a bridge bent system for rapid construction and enhanced seismic performance
MO Eberhard, JF Stanton, OS Haraldsson, G Finnsson, PM Davis, ...
10th US National Conf. on Earthquake Engineering, Earthquake Engineering …, 2014
22014
Accelerating Bridge Construction to Reduce Congestion
MO Eberhard, O Haraldsson, JF Stanton, M Berry
12011
New Connection Between Precast Abutment Wall and CIP Foundation Suitable for Accelerated Bridge Construction
OS Haraldsson, B Bessason, CY Tsai, F Sigurjónsson, RS Smárason
International Symposium of the International Federation for Structural …, 2023
2023
Bent on safety
J Stanton, M Eberhard, L Marsh, B Khaleghi, O Haraldsson, T Janes, ...
Roads & Bridges 50 (1), 2012
2012
The system can't perform the operation now. Try again later.
Articles 1–20