A two-stage stochastic programming model for inventory management in the blood supply chain M Dillon, F Oliveira, B Abbasi International Journal of Production Economics 187, 27-41, 2017 | 305 | 2017 |
Bi-objective resource-constrained project scheduling with robustness and makespan criteria B Abbasi, S Shadrokh, J Arkat Applied mathematics and computation 180 (1), 146-152, 2006 | 199 | 2006 |
Fault diagnosis in multivariate control charts using artificial neural networks STA Niaki, B Abbasi Quality and reliability engineering international 21 (8), 825-840, 2005 | 182 | 2005 |
The inventory centralization impacts on sustainability of the blood supply chain Z Hosseinifard, B Abbasi Computers & Operations Research, 2018 | 177 | 2018 |
Predicting solutions of large-scale optimization problems via machine learning: A case study in blood supply chain management B Abbasi, T Babaei, Z Hosseinifard, K Smith-Miles, M Dehghani Computers & Operations Research 119, 104941, 2020 | 136 | 2020 |
Off-site construction optimization: Sequencing multiple job classes with time constraints M Arashpour, R Wakefield, B Abbasi, EWM Lee, J Minas Automation in construction 71, 262-270, 2016 | 135 | 2016 |
Proactive transshipment in the blood supply chain: A stochastic programming approach M Dehghani, B Abbasi, F Oliveira Omega 98, 102112, 2021 | 132 | 2021 |
Sustainable cold supply chain management under demand uncertainty and carbon tax regulation M Babagolzadeh, A Shrestha, B Abbasi, Y Zhang, A Woodhead, A Zhang Transportation Research Part D: Transport and Environment 80, 102245, 2020 | 132 | 2020 |
Optimal water allocation through a multi-objective compromise between environmental, social, and economic preferences R Roozbahani, S Schreider, B Abbasi Environmental Modelling & Software 64, 18-30, 2015 | 131 | 2015 |
Optimization modeling of multi-skilled resources in prefabrication: Theorizing cost analysis of process integration in off-site construction M Arashpour, V Kamat, Y Bai, R Wakefield, B Abbasi Automation in Construction 95, 1-9, 2018 | 130 | 2018 |
Estimating the parameters of Weibull distribution using simulated annealing algorithm B Abbasi, AHE Jahromi, J Arkat, M Hosseinkouchack Applied Mathematics and Computation 183 (1), 85-93, 2006 | 112 | 2006 |
A matheuristic algorithm for stochastic home health care planning E Nikzad, M Bashiri, B Abbasi European Journal of Operational Research 288 (3), 753-774, 2020 | 99 | 2020 |
Applying simulated annealing to cellular manufacturing system design J Arkat, M Saidi, B Abbasi The International Journal of Advanced Manufacturing Technology 32, 531-536, 2007 | 99 | 2007 |
Integrated management of on-site, coordination and off-site uncertainty: Theorizing risk analysis within a hybrid project setting M Arashpour, B Abbasi, M Arashpour, MR Hosseini, R Yang International Journal of Project Management 35 (4), 647-655, 2017 | 96 | 2017 |
Optimal process integration architectures in off-site construction: theorizing the use of multi-skilled resources M Arashpour, R Wakefield, B Abbasi, M Arashpour, R Hosseini Architectural Engineering and Design Management 14 (1-2), 46-59, 2018 | 89 | 2018 |
Spatial analyses of wildlife contact networks S Davis, B Abbasi, S Shah, S Telfer, M Begon Journal of the Royal Society Interface 12 (102), 20141004, 2015 | 89 | 2015 |
A neural network applied to estimate process capability of non-normal processes B Abbasi Expert Systems with Applications 36 (2), 3093-3100, 2009 | 87 | 2009 |
Robust stochastic vehicle routing and scheduling for bushfire emergency evacuation: An Australian case study S Shahparvari, B Abbasi Transportation Research Part A: Policy and Practice 104, 32-49, 2017 | 83 | 2017 |
An age-based lateral-transshipment policy for perishable items M Dehghani, B Abbasi International Journal of Production Economics 198, 93-103, 2018 | 81 | 2018 |
Improving response surface methodology by using artificial neural network and simulated annealing B Abbasi, H Mahlooji Expert Systems with Applications 39 (3), 3461-3468, 2012 | 79 | 2012 |