Babak Abbasi
Title
Cited by
Cited by
Year
Bi-objective resource-constrained project scheduling with robustness and makespan criteria
B Abbasi, S Shadrokh, J Arkat
Applied mathematics and computation 180 (1), 146-152, 2006
1692006
Fault diagnosis in multivariate control charts using artificial neural networks
STA Niaki, B Abbasi
Quality and reliability engineering international 21 (8), 825-840, 2005
1452005
Applying simulated annealing to cellular manufacturing system design
J Arkat, M Saidi, B Abbasi
The International Journal of Advanced Manufacturing Technology 32 (5-6), 531-536, 2007
832007
A two-stage stochastic programming model for inventory management in the blood supply chain
M Dillon, F Oliveira, B Abbasi
International Journal of Production Economics 187, 27-41, 2017
822017
A neural network applied to estimate process capability of non-normal processes
B Abbasi
Expert Systems with Applications 36 (2), 3093-3100, 2009
732009
Estimating the parameters of Weibull distribution using simulated annealing algorithm
B Abbasi, AHE Jahromi, J Arkat, M Hosseinkouchack
Applied Mathematics and Computation 183 (1), 85-93, 2006
722006
The inventory centralization impacts on sustainability of the blood supply chain
Z Hosseinifard, B Abbasi
Computers & Operations Research, 2018
642018
An efficient tabu search algorithm for flexible flow shop sequence-dependent group scheduling problems
O Shahvari, N Salmasi, R Logendran, B Abbasi
International Journal of Production Research 50 (15), 4237-4254, 2012
642012
Off-site construction optimization: Sequencing multiple job classes with time constraints
M Arashpour, R Wakefield, B Abbasi, EWM Lee, J Minas
Automation in construction 71, 262-270, 2016
592016
Improving response surface methodology by using artificial neural network and simulated annealing
B Abbasi, H Mahlooji
Expert Systems with Applications 39 (3), 3461-3468, 2012
562012
A transformation technique to estimate the process capability index for non-normal processes
SZ Hosseinifard, B Abbasi, S Ahmad, M Abdollahian
The International Journal of Advanced Manufacturing Technology 40 (5-6), 512, 2009
552009
Evaluation of process capability indices of linear profiles
SZ Hosseinifard, B Abbasi
International Journal of Quality & Reliability Management, 2012
472012
Skewness reduction approach in multi-attribute process monitoring
STA Niaki, B Abbasi
Communications in Statistics—Theory and Methods 36 (12), 2313-2325, 2007
472007
Spatial analyses of wildlife contact networks
S Davis, B Abbasi, S Shah, S Telfer, M Begon
Journal of the Royal Society Interface 12 (102), 20141004, 2015
452015
Artificial neural networks in applying MCUSUM residuals charts for AR (1) processes
J Arkat, STA Niaki, B Abbasi
Applied Mathematics and Computation 189 (2), 1889-1901, 2007
452007
A generalized linear statistical model approach to monitor profiles
NST Akhavan, B Abbasi, J Arkat
International Journal of Engineering 20 (3), 233-242, 2007
432007
Optimal water allocation through a multi-objective compromise between environmental, social, and economic preferences
R Roozbahani, S Schreider, B Abbasi
Environmental Modelling & Software 64, 18-30, 2015
422015
On the monitoring of multi-attributes high-quality production processes
STA Niaki, B Abbasi
Metrika 66 (3), 373, 2007
392007
Optimal process integration architectures in off-site construction: theorizing the use of multi-skilled resources
M Arashpour, R Wakefield, B Abbasi, M Arashpour, R Hosseini
Architectural Engineering and Design Management 14 (1-2), 46-59, 2018
372018
Integrated management of on-site, coordination and off-site uncertainty: Theorizing risk analysis within a hybrid project setting
M Arashpour, B Abbasi, M Arashpour, MR Hosseini, R Yang
International Journal of Project Management 35 (4), 647-655, 2017
372017
The system can't perform the operation now. Try again later.
Articles 1–20