Babak Abbasi
TitleCited byYear
Bi-objective resource-constrained project scheduling with robustness and makespan criteria
B Abbasi, S Shadrokh, J Arkat
Applied mathematics and computation 180 (1), 146-152, 2006
1652006
Fault diagnosis in multivariate control charts using artificial neural networks
STA Niaki, B Abbasi
Quality and reliability engineering international 21 (8), 825-840, 2005
1432005
Applying simulated annealing to cellular manufacturing system design
J Arkat, M Saidi, B Abbasi
The International Journal of Advanced Manufacturing Technology 32 (5-6), 531-536, 2007
812007
A neural network applied to estimate process capability of non-normal processes
B Abbasi
Expert Systems with Applications 36 (2), 3093-3100, 2009
732009
Estimating the parameters of Weibull distribution using simulated annealing algorithm
B Abbasi, AHE Jahromi, J Arkat, M Hosseinkouchack
Applied Mathematics and Computation 183 (1), 85-93, 2006
702006
A two-stage stochastic programming model for inventory management in the blood supply chain
M Dillon, F Oliveira, B Abbasi
International Journal of Production Economics 187, 27-41, 2017
652017
An efficient tabu search algorithm for flexible flow shop sequence-dependent group scheduling problems
O Shahvari, N Salmasi, R Logendran, B Abbasi
International Journal of Production Research 50 (15), 4237-4254, 2012
632012
Improving response surface methodology by using artificial neural network and simulated annealing
B Abbasi, H Mahlooji
Expert Systems with Applications 39 (3), 3461-3468, 2012
532012
A transformation technique to estimate the process capability index for non-normal processes
SZ Hosseinifard, B Abbasi, S Ahmad, M Abdollahian
The International Journal of Advanced Manufacturing Technology 40 (5-6), 512, 2009
532009
Off-site construction optimization: Sequencing multiple job classes with time constraints
M Arashpour, R Wakefield, B Abbasi, EWM Lee, J Minas
Automation in construction 71, 262-270, 2016
512016
The inventory centralization impacts on sustainability of the blood supply chain
Z Hosseinifard, B Abbasi
Computers & Operations Research, 2018
502018
Evaluation of process capability indices of linear profiles
S Zahra Hosseinifard, B Abbasi
International Journal of Quality & Reliability Management 29 (2), 162-176, 2012
452012
Skewness reduction approach in multi-attribute process monitoring
STA Niaki, B Abbasi
Communications in Statistics—Theory and Methods 36 (12), 2313-2325, 2007
452007
Artificial neural networks in applying MCUSUM residuals charts for AR (1) processes
J Arkat, STA Niaki, B Abbasi
Applied Mathematics and Computation 189 (2), 1889-1901, 2007
452007
Spatial analyses of wildlife contact networks
S Davis, B Abbasi, S Shah, S Telfer, M Begon
Journal of the Royal Society Interface 12 (102), 20141004, 2015
392015
On the monitoring of multi-attributes high-quality production processes
STA Niaki, B Abbasi
Metrika 66 (3), 373, 2007
392007
A generalized linear statistical model approach to monitor profiles
NST Akhavan, B Abbasi, J Arkat
International Journal of Engineering 20 (3), 233-242, 2007
372007
Optimal water allocation through a multi-objective compromise between environmental, social, and economic preferences
R Roozbahani, S Schreider, B Abbasi
Environmental Modelling & Software 64, 18-30, 2015
362015
Bootstrap method approach in designing multi-attribute control charts
STA Niaki, B Abbasi
The International Journal of Advanced Manufacturing Technology 35 (5-6), 434-442, 2007
332007
Multivariate nonnormal process capability analysis
S Ahmad, M Abdollahian, P Zeephongsekul, B Abbasi
The International Journal of Advanced Manufacturing Technology 44 (7-8), 757, 2009
322009
The system can't perform the operation now. Try again later.
Articles 1–20