Automotive paint shop 4.0 S Bysko, J Krystek, S Bysko Computers & Industrial Engineering 139, 105546, 2020 | 63 | 2020 |
Availability analysis of selected mining machinery J Brodny, S Alszer, J Krystek, M Tutak Archives of Control Sciences 27, 2017 | 59 | 2017 |
Virtual commissioning as the main core of industry 4.0–case study in the automotive paint shop J Krystek, S Alszer, S Bysko International Conference on Intelligent Systems in Production Engineering …, 2018 | 15 | 2018 |
Buffer management in solving a real sequencing problem in the automotive industry–Paint Shop 4.0 concept S Bysko, J Krystek, S Bysko, R Lenort Archives of Control Sciences 29, 2019 | 13 | 2019 |
Simulation and virtual commissioning for intelligent buffer control system—Case study S Alszer, J Krystek, S Bysko 2017 2nd International Conference on Robotics and Automation Engineering …, 2017 | 8 | 2017 |
Badania symulacyjne algorytmu nadążnego harmonogramowania produkcji J Krystek, M Zaborowski IX Szkoła Komputerowego wspomagania projektowania, wytwarzania i …, 2005 | 8 | 2005 |
A Game Theory Approach for Solving the New Concept of Car Sequencing Problem S Bysko, J Krystek 2019 5th International Conference on Control, Automation and Robotics (ICCAR …, 2019 | 6 | 2019 |
Follow-Up Sequencing Algorithm for Car Sequencing Problem 4.0 S Bysko, J Krystek Conference on Automation, 145-154, 2019 | 6 | 2019 |
Modular, didactic flexible manufacturing system—Case study S Alszer, J Krystek 2018 4th International Conference on Control, Automation and Robotics (ICCAR …, 2018 | 6 | 2018 |
The algorithms of buffers handling in car sequencing problem presented on an actual production line S Alszer, J Krystek DEStech Transactions on Engineering and Technology Research, 2017 | 6 | 2017 |
Analysis of the job shop system with transport and setup times in deadlock-free operating conditions J Krystek, M Kozik Archives of Control Sciences 22, 417-425, 2012 | 6 | 2012 |
Działanie algorytmu nadążnego harmonogramowania produkcji przy cyklicznie zmiennych planach operacyjnych J Krystek, M Zaborowski IX KK „Komputerowo Zintegrowane Zarządzanie”, Zakopane, 67-78, 2006 | 6 | 2006 |
Analysis and Simulation of Internal Transport in the High Storage Warehouse J Krystek, S Alszer Analysis and Simulation of Electrical and Computer Systems, 407-420, 2018 | 5 | 2018 |
Contemporary aspects of car sequencing problem in a paint shop J Krystek, S Alszer Mechanik 90 (7), 527-529, 2017 | 5 | 2017 |
Information management in passenger traffic supporting system design as a multi-criteria discrete optimization task A Galuszka, J Krystek, A Swierniak, C Lungoci, T Grzejszczak Archives of Control Sciences, 2017 | 5 | 2017 |
„Współczesne problemy sekwencjonowania samochodów na wydziale lakierni” J Krystek, S Alszer Mechanik 90 (7), 527-529, 2017 | 5 | 2017 |
The role of buffer warehouses in selected production systems J Krystek, S Alszer International Conference on Industrial Logistics, 119-126, 2016 | 5 | 2016 |
Complex approach to the control of car body buffering in the paint shop S Alszer, J Krystek, S Bysko Conference on Automation, 152-161, 2018 | 4 | 2018 |
Analiza procesu magazynowania w magazynie wysokiego składowania,[in:] R J Krystek Komputerowo zintegrowane zarządzanie, Oficyna Wydawnicza Polskiego …, 2011 | 4 | 2011 |
Application of the algorithm DBR Theory of Constraints to production planning J Krystek, T Trznadel Przeglad Elektrotechniczny 88 (10 B), 163-169, 2012 | 3 | 2012 |