Follow
Ali Kourank Beheshti
Title
Cited by
Cited by
Year
The vehicle routing problem with multiple prioritized time windows: A case study
AK Beheshti, SR Hejazi, M Alinaghian
Computers & Industrial Engineering 90, 402-413, 2015
682015
A novel hybrid column generation-metaheuristic approach for the vehicle routing problem with general soft time window
AK Beheshti, SR Hejazi
Information Sciences 316, 598-615, 2015
562015
Multiresolution registration of multitemporal remote sensing images by optimization of mutual information using a simulated annealing based Marquardt-Levenberg technique
H Ghorbani, AA Beheshti
2007 International Conference on Intelligent and Advanced Systems, 685-690, 2007
102007
A Quantum Evolutionary Algorithm for the Vehicle Routing Problem with Delivery Time Cost
A Kourank Beheshti, SR Hejazi
International Journal of Industrial Engineering & Production Research 25 (4 …, 2015
8*2015
A HYBRID META-HEURISTIC ALGORITHM TO MINIMIZE THE NUMBER OF TARDY JOBS IN A DYNAMIC TWO-MACHINE FLOW SHOP PROBLEM.
MA Ardakan, AK Beheshti, SH Mirmohammadi, HD Ardakani
Numerical Algebra, Control & Optimization 7 (4), 2017
42017
A hybrid electromagnetism-like algorithm for integration of process planning and capacitated lot-sizing problem
M Farahnakian, MR Razfar, AK Beheshti
Proceedings of the Institution of Mechanical Engineers, Part B: Journal of …, 2012
42012
Location of Competitive Service Centers for Reducing City Traffic (Case Study: Health Centers of The City of Isfahan)
H Moradi, BN SHETAB, BALI KOURANK, H Poorzahedy
PRODUCTION AND OPERATIONS MANAGEMENT 1 (1), 31-52, 2011
42011
A hybrid metaheuristic algorithm for the vehicle routing problem with delivery time cost
A Kourank Beheshti, SR Hejazi, SH Mirmohammadi
International Journal of Applied Operational Research-An Open Access Journal …, 2014
22014
Artificial Immune System for Single Machine Scheduling and Batching in a Supply Chain Scheduling Problem.
M Rasti-Barzoki, AK Beheshti, SR Hejazi
International Journal of Engineering Science (2008-4870) 27 (2), 2016
12016
Artificial Immune System for Single Machine Scheduling and Batching Problem in Supply Chain
M Rasti-Barzoki, A Kourank Beheshti, SR Hejazi
International Journal of Industrial Engineering & Production Research 27 (2 …, 2016
2016
hybrid parallel simulated annealing—genetic algorithm to minimize the number of tardy jobs in a dynamic two-machine flow shop problem
AA Mostafa, A Kournak Beheshti, SH Mirmohammadi
8th International Industrial Engineering Conference , Amirkabir University …, 2011
2011
A simple direct fuzzy approach for control charts
M Amiri, A KourankBeheshti
7th Annual International Conference on Industrial Engineering, Isfahan …, 2010
2010
A new model for the integration of process planning and the profit maximizing capacitated lot-size problem
A Kourank Beheshti, MR Razfar, M Farahnakian, M Amiri
7th Annual International Conference on Industrial Engineering, 2010
2010
A New Model for Integration of Process Planning and Production Planning for Cylindrical Parts
M Farahnakian, MR Razfar, A Korank Beheshti, M Hadadzadeh, ...
Engineering Systems Design and Analysis 49187, 661-668, 2010
2010
The system can't perform the operation now. Try again later.
Articles 1–14