Cyril Briand
Cyril Briand
LAAS-CNRS - UPS
Verified email at laas.fr - Homepage
Title
Cited by
Cited by
Year
A robust approach for the single machine scheduling problem
C Briand, HT La, J Erschler
Journal of Scheduling 10 (3), 209-221, 2007
372007
Nash equilibria for the multi-agent project scheduling problem with controllable processing times
A Agnetis, C Briand, JC Billaut, P ŠůCha
Journal of Scheduling 18 (1), 15-27, 2015
262015
A new sufficient condition of optimality for the two-machine flowshop problem
C Briand, HT La, J Erschler
European Journal of Operational Research 169 (3), 712-722, 2006
212006
Utilisation d'ordres partiels pour la caractérisation de solution robustes en ordonnancement
HT La
INSA de Toulouse, 2005
202005
Spectral law and polarization properties of the low‐frequency waves at the magnetopause
L Rezeau, G Belmont, N Cornilleau‐Wehrlin, F Reberac, C Briand
Geophysical research letters 26 (6), 651-654, 1999
201999
Scheduling with time lags and preferences: a heuristic
C Briand, E Despontin, F Roubellat
8th workshop on Project Management and Scheduling, Valencia, 3-5, 2002
192002
The truck scheduling problem at crossdocking terminals-exclusive versus mixed mode
L Berghman, C Briand, R Leus, P Lopez
4th International Conference on Operations Research and Enterprise Systems …, 2015
182015
Fast HOG based person detection devoted to a mobile robot with a spherical camera
AA Mekonnen, C Briand, F Lerasle, A Herbulot
2013 IEEE/RSJ International Conference on Intelligent Robots and Systems …, 2013
182013
An efficient ILP formulation for the single machine scheduling problem
C Briand, S Ourari, B Bouzouia
RAIRO-Operations Research 44 (1), 61-71, 2010
132010
People detection with heterogeneous features and explicit optimization on computation time
AA Mekonnen, F Lerasle, A Herbulot, C Briand
2014 22nd International Conference on Pattern Recognition, 4322-4327, 2014
112014
De l'ordonnancement déterministe à l'ordannancement distribué sous incertitudes
S Ourari
112011
The resource-constrained activity insertion problem with minimum and maximum time lags
C Artigues, C Briand
Journal of Scheduling 12 (5), 447-460, 2009
92009
Approches par contraintes pour l’ordonnancement robuste
C Briand, MJ Huguet, HT La, P Lopez
Flexibilité et Robustesse en Ordonnancement sous la direction de JC. Billaut …, 2004
92004
Pilotage d'atelier basé sur un ordonnancement flexible
C Artigues, C Briand, MC Portmann, F Roubellat
92002
Fast minimum float computation in activity networks under interval uncertainty
T Garaix, C Artigues, C Briand
Journal of Scheduling 16 (1), 93-103, 2013
82013
The multiagent project scheduling problem: complexity of finding a minimum-makespan Nash equilibrium
C Briand, A Agnetis, JC Billaut
In Proceedings of the 13th International Conference on Project Management …, 2012
82012
Cooperative project scheduling with controllable processing times: a game theory framework
C Briand, JC Billaut
ETFA2011, 1-7, 2011
72011
Aide à la décision pour une coopération interentreprise
E MONSARRAT, C BRIAND, P ESQUIROL
Journal européen des systèmes automatisés 39 (7), 799-818, 2005
72005
A new any-order schedule generation scheme for resource-constrained project scheduling
C Briand
RAIRO-Operations Research-Recherche Opérationnelle 43 (3), 297-308, 2009
62009
Une approche pour l'ordonnancement robuste de tâches sur une machine
C Briand, HT La, J Erschler
4ème Conférence Francophone de MOdélisation et SIMulation (MOSIM'03), 205, 0
6
The system can't perform the operation now. Try again later.
Articles 1–20