Follow
Fouad Riane
Fouad Riane
Laboratoire Génie Industriel - CentraleSupelec - Ecole Centrale Casablanca
Verified email at centrale-casablanca.ma
Title
Cited by
Cited by
Year
Scheduling an operating theatre under human resource constraints
B Roland, C Di Martinelly, F Riane, Y Pochet
Computers & Industrial Engineering 58 (2), 212-220, 2010
2182010
The inventory-routing problem of returnable transport items with time windows and simultaneous pickup and delivery in closed-loop supply chains
G Iassinovskaia, S Limbourg, F Riane
International Journal of Production Economics 183, 570-582, 2017
1632017
A hybrid three-stage flowshop problem: efficient heuristics to minimize makespan
F Riane, A Artiba, SE Elmaghraby
European Journal of Operational Research 109 (2), 321-329, 1998
1431998
Exact and heuristic methods for the selective maintenance problem
T Lust, O Roux, F Riane
European journal of operational research 197 (3), 1166-1177, 2009
1092009
An integrated production planning and scheduling system for hybrid flowshop organizations
F Riane, A Artiba, S Iassinovski
International Journal of Production Economics 74 (1-3), 33-48, 2001
772001
Operating theatre optimization: A resource-constrained based solving approach
B Roland, C Di Martinelly, F Riane
2006 International conference on service systems and service management 1 …, 2006
752006
A Porter-SCOR modelling approach for the hospital supply chain
C Di Martinelly, F Riane, A Guinet
International Journal of Logistics Systems and Management 5 (3-4), 436-456, 2009
572009
Sequencing a hybrid two-stage flowshop with dedicated machines
F Riane, A Artiba, SE Elmaghraby
International Journal of Production Research 40 (17), 4353-4380, 2002
562002
Integration of simulation and optimization for solving complex decision making problems
S Iassinovski, A Artiba, V Bachelet, F Riane
International Journal of Production Economics 85 (1), 3-10, 2003
512003
Scheduling of a two-machine flowshop with availability constraints on the first machine
H Allaoui, A Artiba, SE Elmaghraby, F Riane
International Journal of Production Economics 99 (1-2), 16-27, 2006
482006
A simulation based approach for supply network control
F Pirard, S Iassinovski, F Riane
International journal of production research 49 (24), 7205-7226, 2011
462011
Scheduling hybrid flowshops: algorithms and applications
F Riane
Sciences de Gestion. Mons: Facultés Universitaires Catholiques de Mons, 1998
431998
An application of a planning and scheduling multi-model approach in the chemical industry
A Artiba, F Riane
Computers in Industry 36 (3), 209-229, 1998
411998
Assessing the impact of stochasticity for operating theater sizing
JS Tancrez, B Roland, JP Cordier, F Riane
Decision Support Systems 55 (2), 616-628, 2013
322013
How stochasticity and emergencies disrupt the surgical schedule
JS Tancrez, B Roland, JP Cordier, F Riane
Intelligent patient management, 221-239, 2009
302009
Chaîne logistique en milieu hospitalier: modélisation des processus de distribution de la pharmacie
C Di Martinelly, A Guinet, F Riane
6e Congrès international de génie industriel, 1-8, 2005
282005
Solving inventory routing with transshipment and substitution under dynamic and stochastic demands using genetic algorithm and deep reinforcement learning
FE Achamrah, F Riane, S Limbourg
International Journal of Production Research 60 (20), 6187-6204, 2022
262022
An inventory optimization model to support operating room schedules
J Rappold, B Van Roo, C Di Martinelly, F Riane
Supply Chain Forum: An International Journal 12 (1), 56-69, 2011
262011
To maintain or not to maintain? What should a risk‐averse decision maker do?
D Bardey, F Riane, A Artiba, L Eeckhoudt
Journal of Quality in Maintenance Engineering 11 (2), 115-120, 2005
232005
Identification of reliability models for non repairable and repairable systems with small samples
O Basile, P Dehombreux, F Riane
Proceedings of IMS2004 Conference on Advances in maintenance and modeling …, 2004
222004
The system can't perform the operation now. Try again later.
Articles 1–20