Insertion techniques for static and dynamic resource-constrained project scheduling C Artigues, P Michelon, S Reusser European Journal of Operational Research 149 (2), 249-267, 2003 | 320 | 2003 |
The car sequencing problem: Overview of state-of-the-art methods and industrial case-study of the ROADEF’2005 challenge problem C Solnon, A Nguyen, C Artigues European Journal of Operational Research 191 (3), 912-927, 2008 | 240 | 2008 |
Resource-constrained project scheduling C Artigues, S Demassey, E Neron John Wiley & Sons, 2008 | 231 | 2008 |
Event-based MILP models for resource-constrained project scheduling problems O Koné, C Artigues, P Lopez, M Mongeau Computers & Operations Research 38 (1), 3-13, 2011 | 224 | 2011 |
LSSPER: solving the resource-constrained project scheduling problem with large neighbourhood search M Palpant, C Artigues, P Michelon Annals of Operations Research 131 (1-4), 237-257, 2004 | 163 | 2004 |
A polynomial activity insertion algorithm in a multi-resource schedule with cumulative constraints and multiple modes C Artigues, F Roubellat European Journal of Operational Research 127 (2), 297-316, 2000 | 159 | 2000 |
Vehicle routing problems with alternative paths: An application to on-demand transportation T Garaix, C Artigues, D Feillet, D Josselin European Journal of Operational Research 204 (1), 62-75, 2010 | 130 | 2010 |
Robust optimization for resource-constrained project scheduling with uncertain activity durations C Artigues, R Leus, FT Nobibon Flexible Services and Manufacturing Journal 25 (1-2), 175-205, 2013 | 118 | 2013 |
A memetic algorithm with a large neighborhood crossover operator for the generalized traveling salesman problem B Bontoux, C Artigues, D Feillet Computers & Operations Research 37 (11), 1844-1852, 2010 | 118 | 2010 |
Constraint-propagation-based cutting planes: An application to the resource-constrained project scheduling problem S Demassey, C Artigues, P Michelon INFORMS Journal on computing 17 (1), 52-65, 2005 | 108 | 2005 |
Maximization of solution flexibility for robust shop scheduling C Artigues, JC Billaut, C Esswein European Journal of Operational Research 165 (2), 314-328, 2005 | 107 | 2005 |
A branch and bound method for the job-shop problem with sequence-dependent setup times C Artigues, D Feillet Annals of Operations Research 159 (1), 135-159, 2008 | 98 | 2008 |
The energy scheduling problem: Industrial case-study and constraint propagation techniques C Artigues, P Lopez, A Hait International Journal of Production Economics 143 (1), 13-23, 2013 | 96 | 2013 |
Schedule generation schemes for the job-shop problem with sequence-dependent setup times: dominance properties and computational analysis C Artigues, P Lopez, PD Ayache Annals of Operations Research 138 (1), 21-52, 2005 | 80 | 2005 |
Solving an integrated employee timetabling and job-shop scheduling problem via hybrid branch-and-bound C Artigues, M Gendreau, LM Rousseau, A Vergnaud Computers & Operations Research 36 (8), 2330-2340, 2009 | 73 | 2009 |
Parallel machine scheduling with precedence constraints and setup times B Gacias, C Artigues, P Lopez Computers & Operations Research 37 (12), 2141-2151, 2010 | 72 | 2010 |
Comparison of mixed integer linear programming models for the resource-constrained project scheduling problem with consumption and production of resources O Koné, C Artigues, P Lopez, M Mongeau Flexible Services and Manufacturing Journal 25 (1-2), 25-47, 2013 | 70 | 2013 |
A batching and scheduling algorithm for the diffusion area in semiconductor manufacturing C Yugma, S Dauzère-Pérès, C Artigues, A Derreumaux, O Sibille International Journal of Production Research 50 (8), 2118-2132, 2012 | 57 | 2012 |
On electrical load tracking scheduling for a steel plant A Hait, C Artigues Computers & Chemical Engineering 35 (12), 3044-3047, 2011 | 57 | 2011 |
Mixed-integer linear programming formulations C Artigues, O Koné, P Lopez, M Mongeau Handbook on Project Management and Scheduling Vol. 1, 17-41, 2015 | 45 | 2015 |