Follow
Shen Zhao
Shen Zhao
RF Control Senior Engineer, Facility for Rare Isotope Beams, Michigan State University
Verified email at frib.msu.edu
Title
Cited by
Cited by
Year
Modified active disturbance rejection control for time-delay systems
S Zhao, Z Gao
ISA transactions 53 (4), 882-888, 2013
2242013
An Active Disturbance Rejection Based Approach to Vibration Suppression in Two‐Inertia Systems
S Zhao, Z Gao
Asian Journal of Control 15 (2), 350-362, 2013
1892013
An Active Disturbance Rejection Based Approach to Vibration Suppression in Two-Inertia Systems
S Zhao, Z Gao
2010 American Control Conference, 1520-1525, 2010
1892010
On active disturbance rejection based control design for superconducting RF cavities
J Vincent, D Morris, N Usher, Z Gao, S Zhao, A Nicoletti, Q Zheng
Nuclear Instruments and Methods in Physics Research Section A: Accelerators …, 2011
1272011
Combined feedforward and model-assisted active disturbance rejection control for non-minimum phase system
L Sun, D Li, Z Gao, Z Yang, S Zhao
ISA transactions 64, 24-33, 2016
1022016
Active disturbance rejection control for non-minimum phase systems
S Zhao, Z Gao
Control Conference (CCC), 2010 29th Chinese, 6066-6070, 2010
752010
An active disturbance rejection control solution for the two-mass-spring benchmark problem
H Zhang, S Zhao, Z Gao
2016 American Control Conference (ACC), 1566-1571, 2016
572016
Tracking and disturbance rejection in non-minimum phase systems
S Zhao, L Sun, D Li, Z Gao
2014 Chinese Control Conference, 882-888, 2014
352014
A field programmable gate array-based time-resolved scaler for collinear laser spectroscopy with bunched radioactive potassium beams
D. M. Rossi, K. Minamisono, B. R. Barquest, G. Bollen, K. Cooper, M. Davis ...
Review of Scientific Instruments 85 (9), 093503, 2014
272014
Practical solutions to the non-minimum phase and vibration problems under the disturbance rejection paradigm
S Zhao
Cleveland State University, 2012
222012
Accelerator commissioning and rare isotope identification at the Facility for Rare Isotope Beams
J Wei, H Ao, B Arend, S Beher, G Bollen, N Bultman, F Casagrande, ...
Modern Physics Letters A 37 (09), 2230006, 2022
192022
THE FRIB PROJECT AT MSU
M Leitner, B Bird, F Casagrande, S Chouhan, C Compton, J Crisp, K Elliot, ...
Proceedings of SRF2013, 1-10, 2013
172013
On model-free accommodation of actuator nonlinearities
S Zhao, Q Zheng, Z Gao
Proceedings of the 10th world congress on intelligent control and automation …, 2012
172012
Fixed-point implementation of active disturbance rejection control for superconducting radio frequency cavities
S Zhao, N Usher, D Morris, J Vincent
2013 American Control Conference, 2693-2698, 2013
132013
Achieving minimum settling time subject to undershoot constraint in systems with one or two real right half plane zeros
S Zhao, W Xue, Z Gao
Journal of Dynamic Systems, Measurement, and Control 135 (3), 034505, 2013
112013
Completion of FRIB superconducting Linac and phased beam commissioning
T Xu, Y Al-Mahmound, J Asciutto, H Ao, B Bird, B Bullock, NK Bultman, ...
Proc. International Conference on RF Superconductivity (SRF’21), 2021
92021
The FRIB SC-Linac-Installation and Phased Commissioning
J Wei, H Ao, S Beher, B Bird, N Bultman, F Casagrande, D Chabot, ...
19th International Conference on RF Superconductivity (SRF'19), Dresden …, 2019
92019
Commissioning of the FRIB RFQ
H Ren, E Pozdeyev, D Morris, S Zhao, P Morrison, R Walker, N Bultman, ...
Journal of Physics: Conference Series 1067 (5), 052010, 2018
82018
FRIB Front End construction and commissioning
E Pozdeyev
IPAC2018, MOZGBF1, 2018
82018
First acceleration at FRIB
E Pozdeyev
Proc. 29th Linear Accelerator Conf, 615, 2018
72018
The system can't perform the operation now. Try again later.
Articles 1–20