Tchernev Nikolay
Tchernev Nikolay
LIMOS UMR 6158
Verified email at isima.fr
Title
Cited by
Cited by
Year
A combined financial and physical flows evaluation for logistic process and tactical production planning: Application in a company supply chain
M Comelli, P Féniès, N Tchernev
International journal of production economics 112 (1), 77-95, 2008
1232008
Job-shop based framework for simultaneous scheduling of machines and automated guided vehicles
P Lacomme, M Larabi, N Tchernev
International Journal of Production Economics 143 (1), 24-34, 2013
982013
A simple metaheuristic approach to the simultaneous scheduling of machines and automated guided vehicles
L Deroussi, M Gourgand, N Tchernev
International Journal of Production Research 46 (8), 2143-2164, 2008
912008
An MILP for scheduling problems in an FMS with one vehicle
A Caumond, P Lacomme, A Moukrim, N Tchernev
European Journal of Operational Research 199 (3), 706-722, 2009
892009
A memetic algorithm for the job-shop with time-lags
A Caumond, P Lacomme, N Tchernev
Computers & Operations Research 35 (7), 2331-2356, 2008
882008
Urban traffic systems modelling methodology
M Chabrol, D Sarramia, N Tchernev
International journal of Production economics 99 (1-2), 156-176, 2006
512006
Object-oriented methodology for FMS modelling and simulation
P Kellert, N Tchernev, C Force
International Journal of Computer Integrated Manufacturing 10 (6), 405-434, 1997
511997
Impact of empty vehicle flow on optimal flow path design for unidirectional AGV systems
XC Sun, N Tchernev
International Journal of Production Research 34 (10), 2827-2852, 1996
431996
Simultaneous job input sequencing and vehicle dispatching in a single-vehicle automated guided vehicle system: a heuristic branch-and-bound approach coupled with a discrete …
P Lacomme, A Moukrim, N Tchernev*
International Journal of Production Research 43 (9), 1911-1942, 2005
412005
A disjunctive graph for the job-shop with several robots
P Lacomme, M Larabi, N Tchernev
MISTA conference 20, 285-292, 2007
312007
Modélisation du processus logistique dans les systèmes flexibles de production
N Tchernev
Clermont-Ferrand 2, 1997
271997
Generic simulation model for hybrid flow-shop
N Grangeon, A Tanguy, N Tchernev
Computers & industrial engineering 37 (1-2), 207-210, 1999
261999
Une contribution à la mesure de la performance dans la supply chain hospitalière: L’exemple du processus opératoire
P Féniès, M Gourgand, N Tchernev
2ème conférence francophone en Gestion et Ingénierie de Systèmes …, 2004
242004
Model for flexibility evaluation in manufacturing network strategic planning
S Kemmoe, PA Pernot, N Tchernev
International Journal of Production Research 52 (15), 4396-4411, 2014
212014
A GRASP× ELS approach for the job-shop with a web service paradigm packaging
M Chassaing, J Fontanel, P Lacomme, L Ren, N Tchernev, P Villechenon
Expert Systems with Applications 41 (2), 544-562, 2014
182014
Un environnement de modélisation pour le système d'information de la Supply Chain: Application au Nouvel Hôpital Estaing
M Chabrol, P Féniès, M Gourgand, N Tchernev
Ingénierie des systèmes d'information (2001) 11 (1), 137-162, 2006
182006
A job-shop with an energy threshold issue considering operations with consumption peaks
S Kemmoé, D Lamy, N Tchernev
IFAC-PapersOnLine 48 (3), 788-793, 2015
162015
A decisional modelling for supply chain management in franchised networks: application in franchise bakery networks
P Fenies, S Lagrange, N Tchernev
Production Planning & Control 21 (6), 595-608, 2010
142010
La logistique entre management et optimisation
P Lièvre, N Tchernev
Hermès-Lavoisier, 2004
142004
Dedicated constraint propagation for Job-Shop problem with generic time-lags
P Lacomme, N Tchernev, MJ Huguet
ETFA2011, 1-7, 2011
122011
The system can't perform the operation now. Try again later.
Articles 1–20