Emmanuel KC Chanda
Emmanuel KC Chanda
Adjunct Professor- Mining Enginneering, University of Adelaide
Verified email at adelaide.edu.au
Title
Cited by
Cited by
Year
Pre-peak and post-peak rock strain characteristics during uniaxial compression by 3D digital image correlation
H Munoz, A Taheri, EK Chanda
Rock Mechanics and Rock Engineering 49 (7), 2541-2554, 2016
992016
Optimal blending of mine production using goal programming and interactive graphics systems
EKC Chanda, K Dagdelen
International Journal of Surface Mining and Reclamation 9 (4), 203-208, 1995
971995
Fracture energy-based brittleness index development and brittleness quantification by pre-peak strength parameters in rock uniaxial compression
H Munoz, A Taheri, EK Chanda
Rock Mechanics and Rock Engineering 49 (12), 4587-4606, 2016
662016
Development of underground mine monitoring and communication system integrated ZigBee and GIS
MA Moridi, Y Kawamura, M Sharifzadeh, EK Chanda, M Wagner, H Jang, ...
International Journal of Mining Science and Technology 25 (5), 811-818, 2015
582015
Rock drilling performance evaluation by an energy dissipation based rock brittleness index
H Munoz, A Taheri, EK Chanda
Rock Mechanics and Rock Engineering 49 (8), 3343-3355, 2016
562016
An investigation of underground monitoring and communication system based on radio waves attenuation using ZigBee
MA Moridi, Y Kawamura, M Sharifzadeh, EK Chanda, H Jang
Tunnelling and Underground Space Technology 43, 362-369, 2014
512014
A comparative study of truck cycle time prediction methods in open‐pit mining
EK Chanda, S Gardiner
Engineering, construction and architectural management, 2010
512010
Performance analysis of ZigBee network topologies for underground space monitoring and communication systems
MA Moridi, Y Kawamura, M Sharifzadeh, EK Chanda, M Wagner, ...
Tunnelling and Underground Space Technology 71, 201-209, 2018
272018
Drilling penetration rate estimation using rock drillability characterization index
A Taheri, Q Qao, E Chanda
Journal of The Institution of Engineers (India): Series D 97 (2), 159-170, 2016
202016
An EPD model of open pit short term production scheduling optimization for stratiform orebodies
EK Chanda, FL Wilke
Proceedings of 23rd APCOM Symposium, 759-768, 1992
201992
Rock cutting characteristics on soft-to-hard rocks under different cutter inclinations
H Munoz, A Taheri, E Chanda
International Journal of Rock Mechanics and Mining Sciences 100 (87), 85-89, 2016
182016
A micro-scale inspired chemo-mechanical model of bonded geomaterials
A Gajo, F Cecinato, T Hueckel
International Journal of Rock Mechanics and Mining Sciences 80, 425-438, 2015
182015
Implementation and outcomes of online self and peer assessment on group based honours research projects
C Wu, E Chanda, J Willison
Assessment & Evaluation in Higher Education 39 (1), 21-37, 2014
162014
Network linear programming optimization of an integrated mining and metallurgical complex
E Chanda
Proceedings of orebody modelling and strategic mine planning: uncertainty …, 2007
162007
Rock cutting performance assessment using strain energy characteristics of rocks
H Munoz, A Taheri, E Chanda
Mining Technology 126 (4), 191-199, 2017
132017
A computer simulation model of a monorail-based mining system for decline development
EK Chanda, B Besa
International Journal of Mining, Reclamation and Environment 25 (1), 52-68, 2011
122011
A disaggregate study of urban rail transit feeder transfer penalties including weather effects
X Gong, G Currie, Z Liu, X Guo
Transportation 45 (5), 1319-1349, 2018
82018
Long term production scheduling optimisation for a surface mining operation: an application of minemax™ scheduling software
EK Chanda, J Ricciardone
International Journal of Surface Mining, Reclamation and Environment 16 (2 …, 2002
82002
Optimising life of mine production schedules in multiple open pit mining operations: A study of effects of production constraints on NPV
J RICCIARDONE, EK CHANDA
Mineral Resources Engineering 10 (03), 301-314, 2001
82001
Design of pneumatic loading system for monorail application
EK Chanda, B Besa
International Journal of Mining and Mineral Engineering 1 (2), 181-203, 2009
62009
The system can't perform the operation now. Try again later.
Articles 1–20