Follow
gopinath chattopadhyay
gopinath chattopadhyay
Post Graduate Program Coordinator, Maintenance and Reliability Engineering
Verified email at federation.edu.au
Title
Cited by
Cited by
Year
Development of a multi‐criteria hierarchical framework for maintenance performance measurement (MPM)
A Parida, G Chattopadhyay
Journal of Quality in maintenance Engineering 13 (3), 241-258, 2007
3322007
Warranty cost analysis for second-hand products
GN Chattopadhyay, DNP Murthy
Mathematical and Computer Modelling: An International Journal 31 (10-12), 81-88, 2000
1222000
Development of lifetime warranty policies and models for estimating costs
G Chattopadhyay, A Rahman
Reliability Engineering & System Safety 93 (4), 522-529, 2008
992008
Critical factors for enterprise resources planning system selection and implementation projects within small to medium enterprises
D Reuther, G Chattopadhyay
2004 IEEE International Engineering Management Conference (IEEE Cat. No …, 2004
812004
Modelling and analysis of rail maintenance cost
V Reddy, G Chattopadhyay, PO Larsson-Kråik, DJ Hargreaves
International Journal of Production Economics 105 (2), 475-482, 2007
722007
Optimal reliability improvement for used items sold with warranty
G Chattopadhyay, D Murthy
CQUniversity, 2004
602004
Reliability improvement through alternative designs—a case study
S Kumar, G Chattopadhyay, U Kumar
Reliability Engineering & System Safety 92 (7), 983-991, 2007
572007
Cost sharing warranty policies for second‐hand products
G Chattopadhyay, DNP Murthy
International Transactions in Operational Research 8 (1), 47-60, 2001
482001
Parameter estimation for rail degradation model
G Chattopadhyay, S Kumar
International Journal of Performability Engineering 5 (2), 119, 2009
402009
Review of long-term warranty policies
A Rahman, G Chattopadhyay
Asia-Pacific Journal of Operational Research 23 (04), 453-472, 2006
402006
Multi criteria maintenance performance measurement: a conceptual model
A Parida, G Chattopadhyay, U Kumar
Proceedings of the 18th International Congress of COMADEM 31, 349-56, 2005
322005
Development of a unified railway track stability management tool to enhance track safety
SS Ahmad, NK Mandal, G Chattopadhyay, J Powell
Proceedings of the Institution of Mechanical Engineers, Part F: Journal of …, 2013
312013
Decision on economical rail grinding interval for controlling rolling contact fatigue
G Chattopadhyay, V Reddy, PO Larsson‐Kråik
International Transactions in Operational Research 12 (6), 545-558, 2005
282005
Warranties for second-hand products
DNPP Murthy, G Chattopadhyay
Flexible Automation and Integrated Manufacturing 1999, 1999
281999
Development of effective performance measures for wayside rail curve lubrication in heavy haul lines
MG Uddin, G Chattopadhyay, M Rasul
Proceedings of the Institution of Mechanical Engineers, Part F: Journal of …, 2014
242014
Optimal service contract policies for outsourcing maintenance service of assets to the service providers
A Rahman, G Chattopadhyay
International Journal of Reliability and Applications 8 (2), 183-197, 2007
232007
Soil factors behind inground decay of timber poles: Testing and interpretation of results
A Rahman, G Chattopadhyay
IEEE transactions on power delivery 22 (3), 1897-1903, 2007
222007
Modeling and analysis of warranty cost for 2D-policies associated with sale of second-hand products
G Chattopadhyay, Y Won-Young
International Journal of Reliability and Applications 7 (1), 71-77, 2006
222006
Long term warranty and after sales service
A Rahman, G Chattopadhyay, A Rahman, G Chattopadhyay
Long Term Warranty and After Sales Service: Concept, Policies and Cost …, 2015
212015
Research methodology for evaluation of top-of-rail friction management in Australian heavy haul networks
M Spiryagin, M Sajjad, D Nielsen, YQ Sun, D Raman, G Chattopadhyay
Proceedings of the Institution of Mechanical Engineers, Part F: Journal of …, 2014
192014
The system can't perform the operation now. Try again later.
Articles 1–20