Mehmet R Taner
Mehmet R Taner
TED University, Industrial Engineering
Verified email at tedu.edu.tr
Title
Cited by
Cited by
Year
On the sensitivity of project variability to activity mean duration
SE Elmaghraby, Y Fathi, MR Taner
International Journal of Production Economics 62 (3), 219-232, 1999
541999
Satisfying due-dates in large multi-factory supply chains
KA Thoney, TJ Hodgson, RE King, MR Taner, AD Wilson
Iie Transactions 34 (9), 803-811, 2002
512002
Selective vehicle routing for a mobile blood donation system
FG Şahinyazan, BY Kara, MR Taner
European Journal of Operational Research 245 (1), 22-34, 2015
492015
Hub location problems: the location of interacting facilities
BY Kara, MR Taner
Foundations of location analysis, 273-288, 2011
362011
The role of repair strategy in warranty cost minimization: An investigation via quasi-renewal processes
G Samatlı-Paç, MR Taner
European Journal of Operational Research 197 (2), 632-641, 2009
352009
Scheduling beams with different priorities on a military surveillance radar
MR Taner, OE Karasan, E Yavuzturk
IEEE Transactions on Aerospace and Electronic Systems 48 (2), 1725-1739, 2012
122012
Minimizing L max for the single machine scheduling problem with family set-ups
SR Schultz, TJ Hodgson*, RE King, MR Taner
International journal of production research 42 (20), 4315-4330, 2004
102004
Endogenous effects of hubbing on flow intensities
MR Taner, BY Kara
Networks and Spatial Economics 16 (4), 1151-1181, 2016
92016
Satisfying due-dates in a job shop with sequence-dependent family set-ups
MR Taner, TJ Hodgson, RE King, KA Thoney
International journal of production research 41 (17), 4153-4169, 2003
92003
Satisfying due-dates in the presence of sequence dependent family setups with a special comedown structure
MR Taner, TJ Hodgson, RE King, SR Schultz
Computers & Industrial Engineering 52 (1), 57-70, 2007
82007
Foundations of location analysis
BY KARA, MR TANER
Foundations of Location Analysis 155, 25-38, 2011
62011
Scheduling with sequence dependent setup times
MR Taner
North Carolina State University, 2001
42001
Parallel Dedicated Machine Scheduling With A Single Server: Full Precedence Case
SR Schultz, MR Taner
IIE Annual Conference. Proceedings, 1, 2004
12004
A study of the mean and variance of project duration in a probabilistic activity network
MR Taner
North Carolina State University, 1998
11998
CURRICULUM VITAE MEHMET R. TANER, Ph. D.
MR TANER
Economics 16 (4), 1151-1181, 2016
2016
Toz deterjan için üretim planlama ve çizelgeleme sistemi tasarımı
TS Sepin, MD Yatkın, MN Eralp, G Memişoğlu, MR Taner, M Özcan, ...
Endüstri Mühendisliği 20 (3), 52-66, 2009
2009
LIST OF CONTENTS VOLUME 52
JM Framinan, S Van de Vonder, F Ballestın, E Demeulemeester, ...
Computers & Industrial Engineering 52, 539-541, 2007
2007
Scheduling Parallel Machines with a Single Server
MR Taner, SR Schultz
TOZ DETERJAN İÇİN ÜRETİM PLANLAMA VE ÇİZELGELEME SİSTEMİ TASARIMI
TS SEPİN, MD Yatkin, MN Eralp, G MEMİŞOĞLU, MR Taner, M Özcan, ...
The system can't perform the operation now. Try again later.
Articles 1–19