Chengbin Chu
Title
Cited by
Cited by
Year
A survey of the state-of-the-art of common due date assignment and scheduling research
V Gordon, JM Proth, C Chu
European Journal of Operational Research 139 (1), 1-25, 2002
5122002
A survey of scheduling with deterministic machine availability constraints
Y Ma, C Chu, C Zuo
Computers & Industrial Engineering 58 (2), 199-211, 2010
3782010
A planning and scheduling problem for an operating theatre using an open scheduling strategy
H Fei, N Meskens, C Chu
Computers & Industrial Engineering 58 (2), 221-230, 2010
2632010
Cyclic scheduling of a hoist with time window constraints
H Chen, C Chu, JM Proth
IEEE Transactions on Robotics and Automation 14 (1), 144-152, 1998
2181998
A Petri net method for schedulability and scheduling problems in single-arm cluster tools with wafer residency time constraints
N Wu, C Chu, F Chu, MC Zhou
IEEE Transactions on Semiconductor Manufacturing 21 (2), 224-237, 2008
2072008
Reliability allocation through cost minimization
AOC Elegbede, C Chu, KH Adjallah, F Yalaoui
IEEE Transactions on reliability 52 (1), 106-111, 2003
2072003
Solving surgical cases assignment problem by a branch-and-price approach
H Fei, C Chu, N Meskens, A Artiba
International Journal of Production Economics 112 (1), 96-108, 2008
1672008
Petri Net Modeling and Cycle-Time Analysis of Dual-Arm Cluster Tools With Wafer Revisiting
N Wu, F Chu, C Chu, M Zhou
IEEE Transactions on Systems, Man and Cybernetics, Part A: Systems 43 (1 …, 2013
1572013
A branch‐and‐bound algorithm to minimize total tardiness with different release dates
C Chu
Naval Research Logistics (NRL) 39 (2), 265-283, 1992
1431992
Petri net-based scheduling of single-arm cluster tools with reentrant atomic layer deposition processes
NQ Wu, F Chu, C Chu, MC Zhou
IEEE Transactions on Automation Science and Engineering 8 (1), 42-55, 2010
1332010
Parallel machine scheduling to minimize total tardiness
F Yalaoui, C Chu
International journal of production economics 76 (3), 265-279, 2002
1312002
A fast heuristic for solving a large-scale static dial-a-ride problem under complex constraints
Z Xiang, C Chu, H Chen
European journal of operational research 174 (2), 1117-1139, 2006
1292006
Solving a tactical operating room planning problem by a column-generation-based heuristic procedure with four criteria
H Fei, C Chu, N Meskens
Annals of Operations Research 166 (1), 91, 2009
1282009
The study of a dynamic dial-a-ride problem under time-dependent and stochastic environments
Z Xiang, C Chu, H Chen
European Journal of Operational Research 185 (2), 534-551, 2008
1222008
Reliability allocation problem in a series–parallel system
A Yalaoui, C Chu, E Chatelet
Reliability engineering & system safety 90 (1), 55-61, 2005
1222005
A linear programming approach for identical parallel machine scheduling with job splitting and sequence-dependent setup times
D Nait Tahar, F Yalaoui, C Chu, L Amodeo
International Journal of Production Economics 99 (1), 63-73, 2006
1202006
An improvement of the Lagrangean relaxation approach for job shop scheduling: a dynamic programming method
H Chen, C Chu, JM Proth
IEEE transactions on robotics and automation 14 (5), 786-795, 1998
1191998
A branch‐and‐bound algorithm to minimize total flow time with unequal release dates
C Chu
Naval Research Logistics (NRL) 39 (6), 859-875, 1992
1121992
A new dynamic programming method for reliability & redundancy allocation in a parallel-series system
A Yalaoui, E Châtelet, C Chu
IEEE transactions on reliability 54 (2), 254-261, 2005
1042005
Supply management in assembly systems
C Chu, JM Proth, X Xie
Naval Research Logistics (NRL) 40 (7), 933-949, 1993
1021993
The system can't perform the operation now. Try again later.
Articles 1–20