Gabriela Dotro
Title
Cited by
Cited by
Year
Clogging in subsurface-flow treatment wetlands: occurrence and contributing factors
P Knowles, G Dotro, J Nivala, J García
Ecological Engineering 37 (2), 99-112, 2011
2912011
Benchmarking of control strategies for wastewater treatment plants
KV Gernaey, U Jeppsson, PA Vanrolleghem, JB Copp
IWA Publishing, 2014
1972014
Clogging in subsurface-flow treatment wetlands: measurement, modeling and management
J Nivala, P Knowles, G Dotro, J García, S Wallace
Water research 46 (6), 1625-1640, 2012
1622012
Greenhouse gas emission in constructed wetlands for wastewater treatment: a review
Ü Mander, G Dotro, Y Ebie, S Towprayoon, C Chiemchaisri, SF Nogueira, ...
Ecological Engineering 66, 19-35, 2014
1362014
Nitrous oxide emissions and dissolved oxygen profiling in a full-scale nitrifying activated sludge treatment plant
A Aboobakar, E Cartmell, T Stephenson, M Jones, P Vale, G Dotro
Water research 47 (2), 524-534, 2013
1362013
Effect of artificial aeration on tertiary nitrification in a full-scale subsurface horizontal flow constructed wetland
E Butterworth, G Dotro, M Jones, A Richards, P Onunkwo, Y Narroway, ...
Ecological engineering 54, 236-244, 2013
522013
Treatment wetlands
G Dotro, G Langergraber, P Molle, J Nivala, J Puigagut, O Stein, ...
IWA publishing, 2017
462017
Performance of pilot-scale constructed wetlands for secondary treatment of chromium-bearing tannery wastewaters
G Dotro, S Castro, O Tujchneider, N Piovano, M Paris, A Faggi, ...
Journal of hazardous materials 239, 142-151, 2012
432012
A review of the impact and potential of intermittent aeration on continuous flow nitrifying activated sludge
G Dotro, B Jefferson, M Jones, P Vale, E Cartmell, T Stephenson
Environmental technology 32 (15), 1685-1697, 2011
372011
Treatment of chromium‐bearing wastewaters with constructed wetlands
G Dotro, D Larsen, P Palazolo
Water and Environment Journal 25 (2), 241-249, 2011
222011
Impacts of coagulation-flocculation treatment on the size distribution and bioavailability of trace metals (Cu, Pb, Ni, Zn) in municipal wastewater
AJ Hargreaves, P Vale, J Whelan, L Alibardi, C Constantino, G Dotro, ...
Water research 128, 120-128, 2018
212018
Treatment Wetlands. Biological Wastewater Treatment Series
G Dotro, G Langergraber, P Molle, J Nivala, J Puigagut, O Stein, ...
IWA Publishing, London, UK. doi 10, 9781780408774, 2017
202017
Mercury and antimony in wastewater: fate and treatment
AJ Hargreaves, P Vale, J Whelan, C Constantino, G Dotro, E Cartmell
Water, Air, & Soil Pollution 227 (3), 89, 2016
192016
Preliminary evaluation of biological and physical–chemical chromium removal mechanisms in gravel media used in constructed wetlands
G Dotro, D Larsen, P Palazolo
Water, Air, & Soil Pollution 215 (1-4), 507-515, 2011
192011
Chromium fate in constructed wetlands treating tannery wastewaters
G Dotro, P Palazolo, D Larsen
Water environment research 81 (6), 617-625, 2009
192009
Performance of four full-scale artificially aerated horizontal flow constructed wetlands for domestic wastewater treatment
E Butterworth, A Richards, M Jones, G Mansi, E Ranieri, G Dotro, ...
Water 8 (9), 365, 2016
172016
Methane emissions from aerated zones in a full-scale nitrifying activated sludge treatment plant
A Aboobakar, M Jones, P Vale, E Cartmell, G Dotro
Water, Air, & Soil Pollution 225 (1), 1814, 2014
152014
Distribution of trace metals (Cu, Pb, Ni, Zn) between particulate, colloidal and truly dissolved fractions in wastewater treatment
AJ Hargreaves, P Vale, J Whelan, C Constantino, G Dotro, P Campo, ...
Chemosphere 175, 239-246, 2017
142017
Coagulation–flocculation process with metal salts, synthetic polymers and biopolymers for the removal of trace metals (Cu, Pb, Ni, Zn) from municipal wastewater
AJ Hargreaves, P Vale, J Whelan, L Alibardi, C Constantino, G Dotro, ...
Clean Technologies and Environmental Policy 20 (2), 393-402, 2018
122018
Removal of phosphorus from trickling filter effluent by electrocoagulation
B Stafford, G Dotro, P Vale, B Jefferson, P Jarvis
Environmental technology 35 (24), 3139-3146, 2014
112014
The system can't perform the operation now. Try again later.
Articles 1–20