Frank Schultmann
Title
Cited by
Cited by
Year
Building Information Modeling (BIM) for existing buildings—Literature review and future needs
R Volk, J Stengel, F Schultmann
Automation in construction 38, 109-127, 2014
12742014
Modeling reverse logistic tasks within closed-loop supply chains: An example from the automotive industry
F Schultmann, M Zumkeller, O Rentz
European journal of operational research 171 (3), 1033-1050, 2006
4022006
Closed-loop supply chains for spent batteries
F Schultmann, B Engels, O Rentz
Interfaces 33 (6), 57-71, 2003
1782003
Sustainable supplier management–a review of models supporting sustainable supplier selection, monitoring and development
K Zimmer, M Fröhling, F Schultmann
International Journal of Production Research 54 (5), 1412-1442, 2016
1662016
Comprehensive techno-economic assessment of dimethyl ether (DME) synthesis and Fischer–Tropsch synthesis as alternative process steps within biomass-to-liquid production
F Trippe, M Fröhling, F Schultmann, R Stahl, E Henrich, A Dalai
Fuel processing technology 106, 577-586, 2013
1442013
Decision maps: A framework for multi-criteria decision support under severe uncertainty
T Comes, M Hiete, N Wijngaards, F Schultmann
Decision Support Systems 52 (1), 108-118, 2011
1202011
Techno-economic assessment of gasification as a process step within biomass-to-liquid (BtL) fuel and chemicals production
F Trippe, M Fröhling, F Schultmann, R Stahl, E Henrich
Fuel Processing Technology 92 (11), 2169-2184, 2011
1152011
Using quality function deployment for technique selection for optimum environmental performance improvement
A Halog, F Schultmann, O Rentz
Journal of Cleaner Production 9 (5), 387-394, 2001
972001
Matching construction and demolition waste supply to recycling demand: a regional management chain model
M Hiete, J Stengel, J Ludwig, F Schultmann
Building Research & Information 39 (4), 333-351, 2011
852011
Tailoring competitive advantages derived from innovation to the needs of construction firms
JN Lim, F Schultmann, G Ofori
Journal of construction engineering and management 136 (5), 568-580, 2010
792010
Energy-oriented deconstruction and recovery planning
F Schultmann, N Sunke
Building Research & Information 35 (6), 602-615, 2007
712007
A high-resolution determination of the technical potential for residential-roof-mounted photovoltaic systems in Germany
K Mainzer, K Fath, R McKenna, J Stengel, W Fichtner, F Schultmann
Solar Energy 105, 715-731, 2014
692014
Assessing the integration of torrefaction into wood pellet production
M Mobini, JC Meyer, F Trippe, T Sowlati, M Fröhling, F Schultmann
Journal of Cleaner Production 78, 216-225, 2014
662014
Stoffstrombasiertes Produktionsmanagement: Betriebswirschaftliche Planung und Steuerung industrieller Kreislaufwirtschaftssysteme
F Schultmann
Erich Schmidt Verlag GmbH & Co KG, 2003
642003
Techno-economic analysis of fast pyrolysis as a process step within biomass-to-liquid fuel production
F Trippe, M Fröhling, F Schultmann, R Stahl, E Henrich
Waste and Biomass Valorization 1 (4), 415-430, 2010
632010
Assessment of an organosolv lignocellulose biorefinery concept based on a material flow analysis of a pilot plant
S Laure, M Leschinsky, M Fröhling, F Schultmann, G Unkelbach
Cellul Chem Technol 48 (9-10), 793-798, 2014
602014
A method for predicting the economic potential of (building-integrated) photovoltaics in urban areas based on hourly Radiance simulations
K Fath, J Stengel, W Sprenger, HR Wilson, F Schultmann, TE Kuhn
Solar energy 116, 357-370, 2015
562015
Design and planning of a closed-loop supply chain with three way recovery and buy-back offer
P Dutta, D Das, F Schultmann, M Fröhling
Journal of Cleaner Production 135, 604-619, 2016
522016
3PL factories or lernstatts? Value‐creation models for 3PL service providers
R Lasch, F Schultmann, G Prockl, A Pflaum, H Kotzab
International Journal of Physical Distribution & Logistics Management, 2012
522012
Flowsheeting-based simulation of recycling concepts in the metal industry
F Schultmann, B Engels, O Rentz
Journal of Cleaner Production 12 (7), 737-751, 2004
522004
The system can't perform the operation now. Try again later.
Articles 1–20