Follow
Arsalan Niroomandi
Title
Cited by
Cited by
Year
Seismic performance of ordinary RC frames retrofitted at joints by FRP sheets
A Niroomandi, A Maheri, MR Maheri, SS Mahini
Engineering Structures 32 (8), 2326-2336, 2010
1662010
Finite element analysis of reinforced concrete beam-column connections with governing joint shear failure mode
MA Najafgholipour, SM Dehghan, A Dooshabi, A Niroomandi
Latin American Journal of Solids and Structures 14, 1200-1225, 2017
1372017
Numerical investigation of the affecting parameters on the shear failure of Nonductile RC exterior joints
A Niroomandi, MA Najafgholipour, HR Ronagh
Engineering Failure Analysis 46, 62-75, 2014
322014
A proposed model for predicting nonlinear behavior of RC joints under seismic loads
J Shayanfar, HA Bengar, A Niroomandi
Materials & Design 95, 563-579, 2016
262016
Research programme on seismic performance of reinforced concrete walls: Key recommendations
A Shegay, F Dashti, L Hogan, Y Lu, A Niroomandi, P Seifi, T Zhang, ...
Bulletin of the New Zealand Society for Earthquake Engineering 53 (2), 54-69, 2020
182020
Experimental study on the effects of bi‐directional loading pattern on rectangular reinforced concrete walls
A Niroomandi, S Pampanin, RP Dhakal, MS Ashtiani, R Nokes
Earthquake Engineering & Structural Dynamics 50 (7), 2010-2030, 2021
152021
Numerical Investigations on Rectangular Squat Reinforced Concrete Walls under Bi-Directional loading
A Niroomandi, MS Ashtiani, S Pampanin, RP Dhakal
Proceedings of the 16th World Conference on Earthquake Engineering, 2017
12*2017
Reinforced concrete wall response under uni-and bi-directional loading
K Beyer, M Hube, R Constantin, A Niroomandi, S Pampanin, R Dhakal, ...
Proceedings of the 16th World Conference on Earthquake Engineering, 2017
112017
Finite element analysis of RC rectangular shear walls under bi-directional loading
A Niroomandi, S Pampanin, RP Dhakal, MS Ashtiani
2016 New Zealand Society for Earthquake Engineering (NZSEE) Annual Technical …, 2016
92016
Comparison of alternative assessment procedures to predict seismic performance of RC columns
A Niroomandi, S Pampanin, R Dhakal, MS Ashtiani
Tenth Pacific Conference on Earthquake Engineering, At Sydney, Australia, 2015
92015
Rectangular RC walls under bi-directional loading: Recent experimental and numerical findings
A Niroomandi, R Dhakal, S Pampanin, M Soleymani Ashtiani, ...
New Zealand Concrete Society, 2018
82018
Seismic behaviour of rectangular reinforced concrete walls under bi-directional loading.
A Niroomandi
University of Canterbury, 2018
72018
Out‐of‐plane shear‐axial failure in slender rectangular reinforced concrete walls
A Niroomandi, S Pampanin, RP Dhakal, MS Ashtiani, C Torre
Earthquake Engineering & Structural Dynamics, 2022
62022
Seismic behavior of rectangular reinforced concrete walls prone to out-of-plane shear-axial failure under bidirectional loading
A Niroomandi, S Pampanin, RP Dhakal, M Soleymani Ashtiani
Journal of Structural Engineering 148 (10), 04022166, 2022
52022
Experimental study on slender rectangular RC walls under bi-directional loading
A Niroomandi, S Pampanin, RP Dhakal, MS Ashtiani
Eleventh US National Conference on Earthquake Engineering, 25-29, 2018
52018
UPGRADING THE DUCTILITY AND SEISMIC BEHAVIOR FACTOR OF ORDINARY RC FRAMES USING FIBER COMPOSITE SHEETS
AM A. Niroomandi
3rd International Conference on Concrete & Development, 2009
52009
Performance based assessment of FRP-retrofitted existing RC frames
SS Mahini, HR Ronagh, A Niroomandi
Proceedings of Fourth International Conference on FRP Composites in Civil …, 2008
52008
FINITE ELEMENT ANALYSIS OF RECTANGULAR REINFORCED CONCRETE WALLS UNDER BI-DIRECTIONAL LOADING
A NIROOMANDI, S PAMPANIN, RP DHAKAL, MS ASHTIANI
The New Zealand Concrete Industry Conference 2016, 2016
32016
The History of Design Guidelines and Details of Reinforced Concrete Column in New Zealand
A Niroomandi, S Pampanin, R Dhakal
NZSEE 2015, 2015
32015
AN ANALYTICAL METHOD TO IDENTIFY REINFORCED CONCRETE WALLS PRONE TO OUT-OF-PLANE SHEAR-AXIAL FAILURE
A NIROOMANDI, S PAMPANIN, RP DHAKAL, MS ASHTIANI
Concrete NZ Conference 2019, 2019
22019
The system can't perform the operation now. Try again later.
Articles 1–20